{"id":100782,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100782"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"sap-business-one","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/","title":{"rendered":"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ SAP Business One<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS \u0645\u0639 SAP Business One: <span class=\"hl\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u064a\u062a\u064a\u062d SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 SAP Business One \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0648\u064a\u0634\u0645\u0644 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u064a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 SAP Business One \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646: \u064a\u0633\u062a\u0642\u0628\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0639\u0628\u0631 Service Layer\u060c \u0648\u064a\u064f\u0639\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0644\u064a\u062a\u0648\u0627\u0641\u0642 \u0645\u0639 \u0625\u0639\u062f\u0627\u062f\u0627\u062a SAP Business One \u0644\u062f\u064a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u0648\u062a\u0633\u062a\u062e\u062f\u0645 Laboratory &amp; Allied \u0647\u0630\u0627 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SAP Business One \u0639\u0644\u0649 HANA.<\/p>\n\n\n<p>\u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0648\u062a\u0628\u0644\u063a \u062a\u0643\u0644\u0641\u0629 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627. \u062a\u0633\u062a\u0645\u0631 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 30 \u064a\u0648\u0645\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062a\u063a\u064a\u0651\u0631 \u0641\u064a \u0625\u0646\u062a\u0627\u062c\u0643\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0644\u0627 \u0645\u0632\u064a\u062f \u0645\u0646 \u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0622\u0644\u0627\u062a \u0641\u0648\u0642 \u0637\u0627\u0642\u062a\u0647\u0627.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0634\u0645\u0644 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0643\u0644 \u0622\u0644\u0629 \u0648\u0641\u0631\u062f \u0648\u0623\u062f\u0627\u0629 \u0628\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0642\u062f\u0631\u062a\u0647\u0627 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u063a\u064a\u0627\u0628 \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0625\u0636\u0627\u0641\u064a. \u0644\u0627 \u064a\u064f\u062d\u062c\u0632 \u0642\u0627\u0644\u0628 \u0645\u0633\u062a\u062e\u062f\u064e\u0645 \u0639\u0644\u0649 \u0622\u0644\u0629 \u0644\u0622\u0644\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647\u060c \u0648\u062a\u064f\u062e\u0635\u0651\u064e\u0635 \u0644\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062b\u0644\u0627\u062b\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u062e\u0627\u0635 \u0645\u062a\u0627\u062d\u064a\u0646 \u0641\u064a \u0648\u0631\u062f\u064a\u0627\u062a\u0647\u0645. \u0648\u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0622\u0644\u0629 \u0645\u0634\u063a\u0648\u0644\u0629\u060c \u064a\u064f\u0646\u0642\u0644 \u0627\u0644\u0639\u0645\u0644 \u0625\u0644\u0649 \u0622\u0644\u0629 \u0623\u0648 \u0634\u062e\u0635 \u0628\u062f\u064a\u0644.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645 \u064a\u0645\u0643\u0646\u0643 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0647\u0627.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0648\u0636\u062d \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062a\u0649 \u0633\u064a\u0646\u062a\u0647\u064a \u0643\u0644 \u0637\u0644\u0628 \u0641\u0639\u0644\u064a\u064b\u0627. \u062a\u062c\u064a\u0628 \u0639\u0645\u0644\u0627\u0621\u0643 \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0627\u0644\u062e\u0637\u0629\u060c \u0644\u0627 \u0625\u0644\u0649 \u0627\u0644\u062a\u062e\u0645\u064a\u0646.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0625\u0639\u0627\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u0629 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0627\u062c\u0644\u0629 \u0648\u0627\u0644\u0623\u0639\u0637\u0627\u0644.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0639\u0646\u062f \u062a\u0648\u0642\u0651\u0641 \u0622\u0644\u0629 \u0623\u0648 \u0648\u0631\u0648\u062f \u0637\u0644\u0628 \u0639\u0627\u062c\u0644 \u0623\u0648 \u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0639\u0645\u0644 \u0645\u0628\u0643\u0631\u064b\u0627\u060c \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627. \u0648\u062a\u0638\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u064a \u062b\u0628\u0651\u062a\u0651\u0647\u0627 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u0627\u0644\u062a\u064a \u062d\u062f\u0651\u062f\u062a\u0647\u0627 \u062d\u0627\u0643\u0645\u0629\u064b \u0644\u0644\u062c\u062f\u0648\u0644.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u062a\u0642\u0644\u064a\u0644 \u0645\u0631\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0639\u0631\u0641 SkyPlanner \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0644\u0627\u0632\u0645 \u0644\u062a\u063a\u064a\u064a\u0631 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0622\u0644\u0629 \u0645\u0646 \u0645\u0646\u062a\u062c \u0625\u0644\u0649 \u0622\u062e\u0631 \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u0641\u0642\u062f \u064a\u0633\u062a\u063a\u0631\u0642 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0645\u0646 \u0627\u0644\u0623\u0632\u0631\u0642 \u0625\u0644\u0649 \u0627\u0644\u0623\u062d\u0645\u0631 30 \u062f\u0642\u064a\u0642\u0629\u060c \u0648\u0645\u0646 \u0627\u0644\u0623\u062d\u0645\u0631 \u0625\u0644\u0649 \u0627\u0644\u0623\u0632\u0631\u0642 60 \u062f\u0642\u064a\u0642\u0629. \u0648\u064a\u0631\u062a\u0651\u0628 \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0647\u0627\u0645 \u0628\u062d\u064a\u062b \u064a\u0642\u0644 \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0636\u0627\u0626\u0639 \u0641\u064a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u062a\u062d\u0642\u0642 SkyPlanner \u0645\u0646 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631 \u062a\u0648\u0631\u064a\u062f\u0647\u0627. \u0648\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u0646\u062a\u0638\u0631 \u062a\u0648\u0631\u064a\u062f\u064b\u0627 \u0645\u0646 \u0627\u0644\u0645\u0648\u0631\u0651\u062f \u0628\u0639\u062f \u0645\u0648\u0639\u062f \u0648\u0635\u0648\u0644\u0647\u060c \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0623\u0646 \u062a\u062a\u0648\u0642\u0641 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0631\u0649 \u0643\u0644 \u0645\u0634\u063a\u0651\u0644 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u0627\u0644\u064a\u0629 \u0639\u0644\u0649 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a\u060c \u0648\u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0639\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u062a\u0646\u0641\u064a\u0630\u0647. \u0648\u064a\u062a\u0627\u0628\u0639 \u0641\u0631\u064a\u0642 \u0627\u0644\u0645\u0643\u062a\u0628 \u0627\u0644\u062a\u0642\u062f\u0645 \u0644\u062d\u0638\u0629 \u0628\u0644\u062d\u0638\u0629\u060c \u0648\u064a\u064f\u0631\u0633\u0644 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0625\u0644\u0649 SAP Business One.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0646\u062f \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u0635\u0646\u0627\u0639\u0629 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u0623\u0635\u0628\u062d \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0633\u062a\u063a\u0631\u0642 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633\u0627\u0639\u0629<\/b><span>\u062a\u0648\u0641\u064a\u0631 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0643\u0644 \u0623\u0633\u0628\u0648\u0639<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0641\u0639\u0644\u064a.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0623\u0635\u0628\u062d \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0641\u0651\u0631 2 \u0633\u0627\u0639\u0629 \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"\u0644\u062d\u0651\u0627\u0645 \u0645\u0646 KJH-Comp \u064a\u062c\u0631\u064a \u0639\u0645\u0644\u064a\u0629 \u062a\u062c\u0644\u064a\u062e \u0644\u0647\u064a\u0643\u0644 \u0641\u0648\u0644\u0627\u0630\u064a \u0645\u0644\u062d\u0648\u0645 \u0641\u064a \u0645\u0635\u0646\u0639 \u0623\u0644\u0627\u0647\u0627\u0631\u0645\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>\u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645\u060c \u0627\u0631\u062a\u0641\u0627\u0639\u064b\u0627 \u0645\u0646 \u0646\u062d\u0648 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u064a\u0624\u062f\u064a SkyPlanner \u062f\u0648\u0631\u064b\u0627 \u062d\u0627\u0633\u0645\u064b\u0627 \u0641\u064a \u0627\u0644\u062d\u0641\u0627\u0638 \u0639\u0644\u0649 \u0627\u0644\u062a\u0632\u0627\u0645\u0646\u0627 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen\u060c \u0627\u0644\u0645\u062f\u064a\u0631 \u0627\u0644\u0639\u0627\u0645<\/b><br>KJH-Comp \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062c\u0632\u0627\u0621 \u0627\u0644\u0645\u064a\u0643\u0627\u0646\u064a\u0643\u064a\u0629 \u0645\u0646 \u0627\u0644\u0635\u0641\u0627\u0626\u062d \u0627\u0644\u0645\u0639\u062f\u0646\u064a\u0629 \u0648\u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u062a\u0639\u0627\u0642\u062f\u064a<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 \u0645\u0646 \u0646\u062d\u0648 50% \u0644\u062a\u0635\u0644 \u0625\u0644\u0649 98%\u060c \u0648\u0623\u0635\u0628\u062d\u062a \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0634\u0631\u0641 \u0648\u0627\u062d\u062f \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0645\u0634\u0631\u0641\u064e\u064a\u0646.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/kjh-comp\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a \u0644\u0634\u0631\u0643\u0629 Mamec\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0634\u0631\u0643\u0629 \u0641\u064a \u0644\u0648\u0647\u064a\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>\u0622\u0644\u0627\u0641 (1,000s)<\/b><span>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u0635\u0628\u062d\u0646\u0627 \u0646\u062a\u062d\u0643\u0645 \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0637\u0631\u064a\u0642\u0629 \u0645\u062e\u062a\u0644\u0641\u0629\u060c \u0648\u0623\u0635\u0628\u062d \u0641\u0647\u0645\u0646\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062e\u062a\u0644\u0641 \u062a\u0645\u0627\u0645\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a<\/b><br>Mamec \u00b7 \u062e\u0644\u0627\u0637\u0627\u062a \u0648\u0645\u0636\u062e\u0627\u062a \u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u062a\u0635\u0646\u064a\u0639 \u062a\u0639\u0627\u0642\u062f\u064a \u0628\u062a\u0642\u0646\u064a\u0627\u062a \u0645\u062a\u0642\u062f\u0645\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u064f\u062c\u062f\u0648\u0644 \u0622\u0644\u0627\u0641 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0625\u062a\u0627\u062d\u0629 \u0631\u0624\u064a\u0629 \u0644\u062d\u0638\u064a\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062c\u0645\u064a\u0639 \u0623\u0642\u0633\u0627\u0645 \u0627\u0644\u0634\u0631\u0643\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/mamec\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-sap-business-one\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u0639\u0645\u0644 SkyPlanner \u0645\u0639 SAP Business One<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u064a\u0631\u0633\u0644 SAP Business One \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u062a\u0646\u062a\u0642\u0644 \u0625\u0644\u0649 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0628\u0645\u0631\u0627\u062d\u0644 \u0645\u0633\u0627\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u064a\u064f\u0646\u0634\u0626 SkyPlanner \u0627\u0644\u062c\u062f\u0648\u0644 \u0648\u064a\u064f\u0628\u0642\u064a\u0647 \u0645\u062d\u062f\u0651\u064e\u062b\u064b\u0627.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u064a\u062e\u0637\u0637 \u0645\u062d\u0631\u0651\u0643 Arcturus \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u062b\u0648\u0627\u0646\u064d\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0639 \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u062a\u064f\u0639\u0627\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u062a\u064f\u0639\u0627\u062f \u062a\u0648\u0627\u0631\u064a\u062e \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0633\u062a\u062d\u0642\u0627\u0642 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One\u060c \u0648\u064a\u064f\u0631\u062d\u0651\u064e\u0644 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0641\u064a \u0635\u0648\u0631\u0629 \u0645\u0633\u062a\u0646\u062f\u0627\u062a Receipt and Issue for Production.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u0635\u0644 SkyPlanner \u0639\u0628\u0631 Service Layer \u0627\u0644\u0631\u0633\u0645\u064a \u0645\u0646 SAP\u060c \u0633\u0648\u0627\u0621 \u0639\u0644\u0649 HANA \u0623\u0648 SQL Server\u060c \u0644\u0630\u0627 \u0644\u0627 \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062a\u062b\u0628\u064a\u062a \u0625\u0636\u0627\u0641\u0629 \u0641\u064a SAP Business One. \u062a\u062e\u062a\u0644\u0641 \u0637\u0631\u064a\u0642\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 B1 \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0648\u0644\u0630\u0644\u0643 \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0641\u0642 \u0625\u0639\u062f\u0627\u062f\u0627\u062a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u0648\u064a\u0642\u062f\u0651\u0645 \u0627\u0644\u062f\u0639\u0645 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u062a\u062d\u0635\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u064a\u0646\u0627\u0633\u0628 \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0648\u064a\u0645\u0643\u0646 \u0644\u0634\u0631\u064a\u0643 B1 \u0627\u0644\u0630\u064a \u062a\u062a\u0639\u0627\u0645\u0644 \u0645\u0639\u0647 \u0623\u0648 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0623\u064a\u0636\u064b\u0627 \u062a\u0637\u0648\u064a\u0631 \u062d\u0644\u0648\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0644\u062f\u0649 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n\n<p>\u062a\u062c\u062f \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 SAP Business One \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-sap-business-one-s-own-planning-is-not-enoug\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0644\u0645\u0627\u0630\u0627 \u0644\u0627 \u062a\u0643\u0641\u064a \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a SAP Business One \u0648\u062d\u062f\u0647\u0627<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062e\u0637\u0637 SAP Business One \u0644\u0644\u0645\u0648\u0627\u062f \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 MRP\u060c \u0648\u064a\u0639\u0631\u0636 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0639\u0644\u0649 \u0627\u0644\u0645\u0648\u0627\u0631\u062f \u064a\u0648\u0645\u064b\u0627 \u0628\u064a\u0648\u0645. \u0648\u0639\u0646\u062f \u062d\u0633\u0627\u0628 \u0639\u062f\u062f \u0627\u0644\u0623\u064a\u0627\u0645 \u0627\u0644\u0644\u0627\u0632\u0645\u0629 \u0644\u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u064a\u0641\u062a\u0631\u0636 <a href=\"https:\/\/help.sap.com\/doc\/08da4f4af99f4fc5a4fbb0249a6698a6\/9.3\/en-US\/How%20to%20Work%20with%20Resources%20and%20Production%20in%20SAP%20Business%20One.pdf\">\u062f\u0644\u064a\u0644 SAP \u0646\u0641\u0633\u0647<\/a> \u0623\u0646 &#8220;a single production order can be produced on a single machine.&#8221; (\u064a\u0645\u0643\u0646 \u062a\u0646\u0641\u064a\u0630 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0648\u0627\u062d\u062f \u0639\u0644\u0649 \u0622\u0644\u0629 \u0648\u0627\u062d\u062f\u0629). \u0648\u064a\u0639\u0646\u064a \u0630\u0644\u0643 \u0641\u064a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u064a\u0648\u0645\u064a:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u064a\u0639\u0631\u0636 \u062a\u062c\u0627\u0648\u0632\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0648\u0644\u0627 \u064a\u0639\u0627\u0644\u062c\u0647\u0627.<\/strong> \u0639\u0646\u062f\u0645\u0627 \u062a\u062d\u062a\u0627\u062c \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0625\u0644\u0649 \u0648\u0642\u062a \u0623\u0637\u0648\u0644 \u0645\u0645\u0627 \u0647\u0648 \u0645\u062a\u0627\u062d \u0644\u0644\u0622\u0644\u0629\u060c \u064a\u0639\u0631\u0636 B1 \u0642\u064a\u0645\u0629 \u0633\u0627\u0644\u0628\u0629\u060c \u0648\u064a\u0639\u062f\u0651\u0644 \u0627\u0644\u0645\u062e\u0637\u0651\u0637 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u064a\u062f\u0648\u064a\u064b\u0627.<\/li>\n\n\n<li><strong>\u064a\u062d\u0633\u0628 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0628\u0627\u0644\u0623\u064a\u0627\u0645.<\/strong> \u062a\u064f\u062c\u0645\u0639 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0648\u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0641\u064a \u0625\u062c\u0645\u0627\u0644\u064a \u064a\u0648\u0645\u064a \u0648\u0627\u062d\u062f \u0641\u0642\u0637\u060c \u0644\u0630\u0627 \u062a\u0643\u0648\u0646 \u0627\u0644\u062e\u0637\u0629 \u0628\u0627\u0644\u0623\u064a\u0627\u0645 \u0644\u0627 \u0628\u0627\u0644\u0633\u0627\u0639\u0627\u062a.<\/li>\n\n\n<li><strong>\u0644\u0627 \u064a\u062a\u062d\u0642\u0642 \u0645\u0646 \u0645\u062a\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u062a\u0628\u062f\u064a\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645 \u0623\u0648 \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644.<\/strong> \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u062b\u0627\u0628\u062a \u0644\u0643\u0644 \u0623\u0645\u0631\u060c \u0628\u063a\u0636 \u0627\u0644\u0646\u0638\u0631 \u0639\u0646 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u0633\u0627\u0628\u0642\u0629. \u0648\u0644\u0627 \u064a\u062a\u062d\u0642\u0642 \u0627\u0644\u0646\u0638\u0627\u0645 \u0645\u0646 \u062a\u0648\u0627\u0641\u0631 \u0623\u062f\u0627\u0629 \u0623\u0648 \u0645\u0634\u063a\u0651\u0644 \u0641\u064a \u0633\u0627\u0639\u0629 \u0645\u062d\u062f\u062f\u0629.<\/li>\n\n<\/ul>\n\n\n<p>\u062a\u062c\u062f \u0634\u0631\u062d\u064b\u0627 \u0644\u0643\u0644 \u0642\u064a\u062f \u0641\u064a \u0645\u0642\u0627\u0644 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u0647\u0644 \u064a\u062f\u0639\u0645 SAP Business One \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-business-one-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0642\u0627\u0631\u0646\u0629 \u0628\u064a\u0646 SAP Business One \u0648\u062d\u062f\u0647 \u0648\u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0647 \u0645\u0639 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>SAP Business One \u0648\u062d\u062f\u0647<\/th><th>SAP Business One \u0645\u0639 SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629<\/td><td>\u0642\u064a\u0645\u0629 \u064a\u0648\u0645\u064a\u0629 \u0648\u0627\u062d\u062f\u0629 \u0644\u0643\u0644 \u0645\u0648\u0631\u062f\u061b \u062a\u0638\u0647\u0631 \u062a\u062c\u0627\u0648\u0632\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0628\u0642\u064a\u0645 \u0633\u0627\u0644\u0628\u0629<\/td><td>\u062a\u064f\u0631\u0627\u0639\u0649 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0641\u0631\u062f \u0648\u0623\u062f\u0627\u0629<\/td><\/tr><tr><td>\u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0632\u0645\u0646\u064a<\/td><td>\u0644\u0627 \u064a\u062d\u062f\u062f \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u061b \u064a\u0639\u062f\u0651\u0644 \u0627\u0644\u0645\u062e\u0637\u0651\u0637 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0623\u0648\u0627\u0645\u0631<\/td><td>\u062c\u062f\u0648\u0644 \u0645\u0641\u0635\u0651\u0644 \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u062b\u0648\u0627\u0646\u064d<\/td><\/tr><tr><td>\u0627\u0644\u062a\u0628\u062f\u064a\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645<\/td><td>\u0648\u0642\u062a \u062a\u0647\u064a\u0626\u0629 \u062b\u0627\u0628\u062a \u0644\u0627 \u064a\u062a\u063a\u064a\u0631 \u0645\u0646 \u0623\u0645\u0631 \u0625\u0644\u0649 \u0622\u062e\u0631<\/td><td>\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f<\/td><\/tr><tr><td>\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>\u064a\u062a\u062d\u0642\u0642 MRP \u0645\u0646 \u0627\u0644\u0645\u0643\u0648\u0646\u0627\u062a\u060c \u0644\u0627 \u0645\u0646 \u0627\u0644\u0623\u062d\u0645\u0627\u0644 \u0639\u0644\u0649 \u0627\u0644\u0622\u0644\u0627\u062a<\/td><td>\u062a\u0628\u062f\u0623 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u0646\u062f \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f \u0641\u064a \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0623\u0648 \u0648\u0635\u0648\u0644 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u0627\u062a<\/td><\/tr><tr><td>\u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a<\/td><td>\u0625\u0639\u0627\u062f\u0629 \u062a\u0634\u063a\u064a\u0644 MRP \u0648\u062a\u0639\u062f\u064a\u0644 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u064a\u062f\u0648\u064a\u064b\u0627<\/td><td>\u064a\u0639\u064a\u062f Autopilot \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u0635\u0646\u0639 \u0628\u0627\u0644\u0643\u0627\u0645\u0644 \u0648\u0641\u0642 \u0623\u0648\u0644\u0648\u064a\u0627\u062a\u0643<\/td><\/tr><tr><td>\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>\u0625\u062f\u062e\u0627\u0644 \u0645\u0633\u062a\u0646\u062f\u0627\u062a Issue \u0648Receipt \u0641\u064a B1<\/td><td>\u064a\u0631\u0649 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645\u0647\u0645 \u0648\u064a\u0633\u062c\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-sap-business-one\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u062a\u062e\u062a\u0627\u0631 \u0623\u062f\u0627\u0629 \u062c\u062f\u0648\u0644\u0629 \u0644\u0644\u0639\u0645\u0644 \u0645\u0639 SAP Business One<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0646\u0627\u0633\u0628 \u0625\u0645\u0643\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a SAP Business One \u0645\u0635\u0646\u0639\u064b\u0627 \u0644\u062f\u064a\u0647 \u0639\u062f\u062f \u0642\u0644\u064a\u0644 \u0645\u0646 \u0627\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u0637\u0644\u0628 \u0645\u0633\u062a\u0642\u0631\u060c \u0648\u0645\u0648\u0627\u0639\u064a\u062f \u062a\u064f\u062d\u062f\u0651\u064e\u062f \u0639\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0627\u0644\u064a\u0648\u0645.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u062a\u062a\u063a\u064a\u0631 \u0627\u0644\u062e\u0637\u0629 \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0623\u0633\u0628\u0648\u0639.<\/strong> \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u060c \u0648\u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 SAP Business One \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u062a\u0639\u062f\u064a\u0644\u0647\u0627 \u064a\u062f\u0648\u064a\u064b\u0627.<\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u064a\u062d\u062f\u062f \u0627\u0644\u062a\u0628\u062f\u064a\u0644 \u0628\u064a\u0646 \u0627\u0644\u0645\u0647\u0627\u0645 \u062d\u062c\u0645 \u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u064a\u0631\u062a\u0651\u0628 SkyPlanner \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0625\u062c\u0645\u0627\u0644\u064a \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u064a\u062d\u062f\u062f \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u062a\u0646\u0641\u064a\u0630\u0647\u0627 \u062a\u0627\u0644\u064a\u064b\u0627.<\/strong><\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u064a\u062d\u062f\u062f \u0648\u0635\u0648\u0644 \u0627\u0644\u0645\u0648\u0627\u062f \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u0628\u062f\u0624\u0647\u0627.<\/strong><\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u062a\u0631\u064a\u062f \u0627\u0644\u0627\u062d\u062a\u0641\u0627\u0638 \u0628\u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a B1.<\/strong> \u062a\u0638\u0644 \u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648MRP \u0641\u064a SAP Business One.<\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u062a\u0631\u064a\u062f \u0627\u0644\u062c\u0645\u0639 \u0628\u064a\u0646 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0648\u062a\u0633\u062c\u064a\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0636\u0645\u0646 \u0623\u062f\u0627\u0629 \u0648\u0627\u062d\u062f\u0629.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u062a\u0628\u062f\u0623<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629.<\/strong> 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0648\u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u062c\u0645\u064a\u0639 \u0645\u064a\u0632\u0627\u062a Basic\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646.<\/li>\n\n\n<li><strong>\u0623\u0646\u0634\u0626 \u0646\u0645\u0648\u0630\u062c\u064b\u0627 \u0644\u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u0623\u0636\u0641 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0623\u0641\u0631\u0627\u062f \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0645\u0648\u0627\u0631\u062f\u0643 \u0641\u064a B1\u060c \u0623\u0648 \u0627\u0633\u062a\u0648\u0631\u062f\u0647\u0627. \u062a\u062a\u0648\u0641\u0631 \u0645\u0633\u0627\u0639\u062f\u0629 \u0641\u064a \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629.<\/li>\n\n\n<li><strong>\u062d\u0645\u0651\u0644 \u0623\u0648\u0627\u0645\u0631\u0643.<\/strong> \u0635\u062f\u0651\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0645\u0646 SAP Business One \u0625\u0644\u0649 Excel\u060c \u062b\u0645 \u0627\u0633\u062a\u0648\u0631\u062f\u0647\u0627 \u0648\u0642\u0627\u0631\u0646 \u062c\u062f\u0648\u0644 SkyPlanner \u0628\u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629.<\/li>\n\n\n<li><strong>\u0627\u0631\u0628\u0637 SAP Business One.<\/strong> \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0648\u064a\u062f\u0639\u0645\u0647 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u0627\u0644\u0623\u0633\u0639\u0627\u0631.<\/strong> \u062a\u064f\u062d\u062a\u0633\u0628 \u0631\u0633\u0648\u0645 \u0627\u0644\u0628\u0627\u0642\u0627\u062a \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0625\u0632\u0627\u0644\u062a\u0647\u0627 \u0623\u0648 \u0625\u0644\u063a\u0627\u0621 \u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0643 \u0641\u064a \u0623\u064a \u0648\u0642\u062a. \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a> \u0644\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 SAP Business One \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627 \u064a\u062f\u0639\u0645\u0647 \u0627\u0644\u0625\u0635\u062f\u0627\u0631 \u0627\u0644\u0642\u064a\u0627\u0633\u064a \u0645\u0646 SAP Business One. \u064a\u062a\u0636\u0645\u0646 B1 \u0646\u0638\u0627\u0645 MRP \u0648\u0637\u0627\u0642\u0629 \u064a\u0648\u0645\u064a\u0629 \u0644\u0644\u0645\u0648\u0627\u0631\u062f\u060c \u0648\u062a\u0639\u0631\u0636 \u0646\u0627\u0641\u0630\u0629 Resource Capacity \u062a\u062c\u0627\u0648\u0632\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0628\u0642\u064a\u0645 \u0633\u0627\u0644\u0628\u0629. \u062b\u0645 \u064a\u0639\u0627\u0644\u062c\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0651\u0637\u0648\u0646 \u0628\u062a\u0639\u062f\u064a\u0644 \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u064a\u062f\u0648\u064a\u064b\u0627. \u064a\u0636\u064a\u0641 SkyPlanner APS <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/finite-capacity-scheduling\/\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/a> \u0644\u0644\u0645\u0635\u0646\u0639 \u0628\u0627\u0644\u0643\u0627\u0645\u0644 \u0628\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0628\u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a B1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062a\u062b\u0628\u064a\u062a \u0625\u0636\u0627\u0641\u0629 \u0641\u064a SAP Business One\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u064a\u0639\u0645\u0644 SkyPlanner \u0641\u064a \u0627\u0644\u0633\u062d\u0627\u0628\u0629 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 SAP Business One\u060c \u0648\u064a\u062a\u0635\u0644 \u0639\u0628\u0631 Service Layer \u0627\u0644\u0631\u0633\u0645\u064a \u0645\u0646 SAP\u060c \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0643\u0627\u0626\u0646\u0627\u062a B1 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u0642\u0637.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062d\u0644 SkyPlanner \u0645\u062d\u0644 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a SAP Business One\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627\u060c \u0628\u0644 \u064a\u0639\u0645\u0644 \u0645\u0643\u0645\u0651\u0644\u064b\u0627 \u0644\u0647\u0627. \u062a\u0638\u0644 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648MRP \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0634\u0624\u0648\u0646 \u0627\u0644\u0645\u0627\u0644\u064a\u0629 \u0641\u064a B1\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 MRP Wizard \u0643\u0645\u0627 \u0641\u064a \u0627\u0644\u0633\u0627\u0628\u0642. \u0648\u064a\u062c\u062f\u0648\u0644 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0646\u0627\u062a\u062c\u0629 \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629\u060c \u062b\u0645 \u064a\u0639\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0625\u0644\u0649 B1.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u062a\u0643\u0644\u0641\u0629 SkyPlanner \u0644\u0645\u0635\u0646\u0639 \u064a\u0633\u062a\u062e\u062f\u0645 SAP Business One\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062a\u0628\u062f\u0623 \u0627\u0644\u0623\u0633\u0639\u0627\u0631 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0625\u0636\u0627\u0641\u0629 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629. \u0648\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0647\u064a \u0645\u0648\u0631\u062f \u0625\u0646\u062a\u0627\u062c \u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0623\u0639\u0645\u0627\u0644 \u0645\u062c\u062f\u0648\u0644\u0629 \u062e\u0627\u0635\u0629 \u0628\u0647. \u0648\u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0644\u0643 \u0645\u0633\u0628\u0642\u064b\u0627 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0648\u0641\u0642 \u0639\u0645\u0644\u064a\u0627\u062a\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u0633\u0639\u0631 \u0628\u0627\u0642\u062a\u0643\u060c \u0644\u062a\u0639\u0631\u0641 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u0645 \u064a\u0633\u062a\u063a\u0631\u0642 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u062a\u0647\u064a\u0626\u0629. \u064a\u0637\u0627\u0628\u0642 \u0627\u0644\u0641\u0631\u064a\u0642 \u0645\u0648\u0627\u0631\u062f\u0643 \u0648\u0645\u0631\u0627\u062d\u0644 \u0645\u0633\u0627\u0631 \u0627\u0644\u062a\u0635\u0646\u064a\u0639\u060c \u0648\u064a\u0631\u0628\u0637 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u064f\u0639\u064a\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0627\u0644\u0646\u0638\u0627\u0645. \u0648\u064a\u064f\u062e\u062a\u0628\u0631 \u0643\u0644 \u0634\u064a\u0621 \u0628\u0627\u0644\u0645\u0642\u0627\u0631\u0646\u0629 \u0645\u0639 \u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0631\u0628\u0637\u0647 \u0645\u0639 SAP Business One\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u0633\u062a\u062e\u062f\u0645 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u062a\u064a \u062a\u0645\u062a\u062f 30 \u064a\u0648\u0645\u064b\u0627 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u0627\u0644\u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0635\u062f\u0651\u0631\u0629 \u0645\u0646 B1 \u0625\u0644\u0649 Excel \u0623\u0648 CSV. \u0648\u062a\u0631\u0649 \u0646\u062a\u0627\u0626\u062c \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0643 \u0641\u064a \u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0623\u064a \u0623\u0639\u0645\u0627\u0644 \u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0639\u0645\u0644 SkyPlanner \u0645\u0639 SAP Business One \u0639\u0644\u0649 SQL Server \u0643\u0645\u0627 \u064a\u0639\u0645\u0644 \u0639\u0644\u0649 HANA\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u064a\u0639\u0645\u0644 Service Layer \u0645\u0646 SAP \u0639\u0644\u0649 \u0643\u0644\u0651\u064d \u0645\u0646 HANA \u0648SQL Server\u060c \u0648\u064a\u0645\u0643\u0646 \u0627\u0633\u062a\u064a\u0631\u0627\u062f \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0644\u0644\u062a\u062c\u0631\u0628\u0629 \u0645\u0646 \u0623\u064a\u0651\u064d \u0645\u0646\u0647\u0645\u0627.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ SAP Business One SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u062a\u064a\u062d SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 SAP Business One \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0648\u064a\u0634\u0645\u0644 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u064a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. &#8230; <a title=\"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/\" aria-label=\"Read more about SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100693,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100782","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u062f\u0642\u064a\u0642\u0629\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-one\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-one\\\/\",\"name\":\"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-one\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-one\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/sap-business-one\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One | SkyPlanner APS","description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/","og_locale":"ar_AR","og_type":"article","og_title":"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"1 \u062f\u0642\u064a\u0642\u0629"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/","name":"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a SAP Business One. \u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647 \u0645\u0639 B1. \u0628\u062f\u0621\u064b\u0627 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 \u0645\u062c\u0627\u0646\u064a\u0629.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/sap-business-one\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ SAP Business One SkyPlanner APS \u0645\u0639 SAP Business One: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u062a\u064a\u062d SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 SAP Business One \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0642\u062f\u0631\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u060c \u0648\u064a\u0634\u0645\u0644 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u064a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100782","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=100782"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100782\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100693"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=100782"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}