{"id":100752,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=100752"},"modified":"2026-10-23T13:41:12","modified_gmt":"2026-10-23T13:41:12","slug":"netsuite","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/","title":{"rendered":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/\">\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a<\/a> \/ <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/\">ERP<\/a> \/ Oracle NetSuite<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: <span class=\"hl\">\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/h1>\n\n\n<p class=\"fx-hero__sub\">\u064a\u0648\u0641\u0651\u0631 SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 Oracle NetSuite \u062c\u062f\u0648\u0644\u064b\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629\u060c \u0633\u0648\u0627\u0621 \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 Advanced Manufacturing SuiteApp \u0623\u0645 \u0644\u0627. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u0627\u062d\u062c\u0632 \u0639\u0631\u0636\u064b\u0627 \u062a\u0648\u0636\u064a\u062d\u064a\u064b\u0627<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"\u0645\u062e\u0637\u0637 Gantt \u0627\u0644\u0632\u0645\u0646\u064a \u0641\u064a SkyPlanner APS \u064a\u0639\u0631\u0636 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0645\u062c\u062f\u0648\u0644\u0629 \u0639\u0644\u0649 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u060c \u0648\u0623\u0633\u0641\u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0627\u0644\u0637\u0644\u0628\u0627\u062a.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u0643\u0627\u0645\u0644 SkyPlanner \u0645\u0639 NetSuite \u0641\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646: \u064a\u0633\u062a\u0642\u0628\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u0648\u064a\u0639\u064a\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0648\u062a\u0642\u062f\u0651\u0645 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0627\u0644\u0645\u0633\u062c\u0651\u0644\u0629. \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 \u062d\u0633\u0627\u0628\u0643 \u0641\u064a NetSuite \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u062a\u0633\u062a\u062e\u062f\u0645 UTU \u0628\u0627\u0644\u0641\u0639\u0644 SkyPlanner \u0645\u062a\u0643\u0627\u0645\u0644\u064b\u0627 \u0645\u0639 NetSuite \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0641\u0639\u0644\u064a.<\/p>\n\n\n<p>\u062a\u0628\u062f\u0623 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a> \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0628\u062a\u0643\u0644\u0641\u0629 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629. \u062a\u062a\u064a\u062d \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0644\u0645\u062f\u0629 30 \u064a\u0648\u0645\u064b\u0627\u060c \u062f\u0648\u0646 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646\u060c \u0628\u0627\u0644\u0627\u0639\u062a\u0645\u0627\u062f \u0639\u0644\u0649 \u0645\u0644\u0641 CSV \u0645\u064f\u0635\u062f\u0651\u064e\u0631 \u0645\u0646 NetSuite.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-changes-in-your-production\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062a\u063a\u064a\u0651\u0631 \u0641\u064a \u0625\u0646\u062a\u0627\u062c\u0643\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-pain ind-cards\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 18a8 8 0 1 1 16 0\"\/><path d=\"M12 18l4-5\"\/><circle cx=\"12\" cy=\"18\" r=\"1.2\" fill=\"currentColor\" stroke=\"none\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0644\u0627 \u0645\u0632\u064a\u062f \u0645\u0646 \u062a\u062d\u0645\u064a\u0644 \u0627\u0644\u0622\u0644\u0627\u062a \u0641\u0648\u0642 \u0637\u0627\u0642\u062a\u0647\u0627.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u064f\u062e\u0637\u0651\u064e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0641\u0631\u062f \u0648\u0623\u062f\u0627\u0629 \u0648\u0641\u0642 \u0642\u062f\u0631\u062a\u0647\u0627 \u0627\u0644\u0641\u0639\u0644\u064a\u0629\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0648\u0627\u0644\u063a\u064a\u0627\u0628 \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0625\u0636\u0627\u0641\u064a. \u0644\u0627 \u064a\u064f\u062d\u062c\u0632 \u0642\u0627\u0644\u0628 \u0645\u0633\u062a\u062e\u062f\u064e\u0645 \u0639\u0644\u0649 \u0622\u0644\u0629 \u0644\u0622\u0644\u0629 \u0623\u062e\u0631\u0649 \u0641\u064a \u0627\u0644\u0648\u0642\u062a \u0646\u0641\u0633\u0647\u060c \u0648\u064a\u064f\u062e\u0635\u0651\u064e\u0635 \u0644\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062b\u0644\u0627\u062b\u0629 \u0645\u0634\u063a\u0651\u0644\u064a\u0646 \u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u062e\u0627\u0635 \u0645\u062a\u0627\u062d\u064a\u0646 \u0641\u064a \u0648\u0631\u062f\u064a\u0627\u062a\u0647\u0645. \u0648\u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0622\u0644\u0629 \u0645\u0634\u063a\u0648\u0644\u0629\u060c \u064a\u064f\u0646\u0642\u0644 \u0627\u0644\u0639\u0645\u0644 \u0625\u0644\u0649 \u0622\u0644\u0629 \u0623\u0648 \u0634\u062e\u0635 \u0628\u062f\u064a\u0644.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"12\" cy=\"12\" r=\"8.5\"\/><path d=\"M12 7.5V12l3 2\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0645\u0648\u0627\u0639\u064a\u062f \u062a\u0633\u0644\u064a\u0645 \u064a\u0645\u0643\u0646\u0643 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0647\u0627.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0648\u0636\u062d \u0627\u0644\u062c\u062f\u0648\u0644 \u0645\u062a\u0649 \u0633\u064a\u0646\u062a\u0647\u064a \u0643\u0644 \u0637\u0644\u0628 \u0641\u0639\u0644\u064a\u064b\u0627. \u062a\u062c\u064a\u0628 \u0639\u0645\u0644\u0627\u0621\u0643 \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0627\u0644\u062e\u0637\u0629\u060c \u0644\u0627 \u0625\u0644\u0649 \u0627\u0644\u062a\u062e\u0645\u064a\u0646.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--purple\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 12a9 9 0 0 1 15-6.7L21 8\"\/><path d=\"M21 3v5h-5\"\/><path d=\"M21 12a9 9 0 0 1-15 6.7L3 16\"\/><path d=\"M3 21v-5h5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0625\u0639\u0627\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u0629 \u0639\u0646\u062f \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u0639\u0627\u062c\u0644\u0629 \u0648\u0627\u0644\u0623\u0639\u0637\u0627\u0644.<\/p>\n\n\n<p class=\"fx-pain__b\">\u0639\u0646\u062f \u062a\u0648\u0642\u0651\u0641 \u0622\u0644\u0629 \u0623\u0648 \u0648\u0631\u0648\u062f \u0637\u0644\u0628 \u0639\u0627\u062c\u0644 \u0623\u0648 \u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0639\u0645\u0644 \u0645\u0628\u0643\u0631\u064b\u0627\u060c \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627. \u0648\u062a\u0638\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u064a \u062b\u0628\u0651\u062a\u0651\u0647\u0627 \u0648\u0627\u0644\u0623\u0648\u0644\u0648\u064a\u0627\u062a \u0627\u0644\u062a\u064a \u062d\u062f\u0651\u062f\u062a\u0647\u0627 \u062d\u0627\u0643\u0645\u0629\u064b \u0644\u0644\u062c\u062f\u0648\u0644.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--orange\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M4 9h13l-3.5-3.5M20 15H7l3.5 3.5\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u062a\u0642\u0644\u064a\u0644 \u0645\u0631\u0627\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0628\u064a\u0646 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0639\u0631\u0641 SkyPlanner \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0644\u0627\u0632\u0645 \u0644\u062a\u063a\u064a\u064a\u0631 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0622\u0644\u0629 \u0645\u0646 \u0645\u0646\u062a\u062c \u0625\u0644\u0649 \u0622\u062e\u0631 \u0641\u064a \u0643\u0644\u0627 \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u064a\u0646. \u0641\u0642\u062f \u064a\u0633\u062a\u063a\u0631\u0642 \u0627\u0644\u0627\u0646\u062a\u0642\u0627\u0644 \u0645\u0646 \u0627\u0644\u0623\u0632\u0631\u0642 \u0625\u0644\u0649 \u0627\u0644\u0623\u062d\u0645\u0631 30 \u062f\u0642\u064a\u0642\u0629\u060c \u0648\u0645\u0646 \u0627\u0644\u0623\u062d\u0645\u0631 \u0625\u0644\u0649 \u0627\u0644\u0623\u0632\u0631\u0642 60 \u062f\u0642\u064a\u0642\u0629. \u0648\u064a\u0631\u062a\u0651\u0628 \u0627\u0644\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0647\u0627\u0645 \u0628\u062d\u064a\u062b \u064a\u0642\u0644 \u0627\u0644\u0648\u0642\u062a \u0627\u0644\u0636\u0627\u0626\u0639 \u0641\u064a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><path d=\"M3 21V9l9-5 9 5v12\"\/><path d=\"M2 21h20\"\/><rect x=\"8\" y=\"13\" width=\"8\" height=\"8\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u062c\u062f\u0648\u0644 \u064a\u0631\u0627\u0639\u064a \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u0648\u0627\u062f.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u062a\u062d\u0642\u0642 SkyPlanner \u0645\u0646 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0627\u0644\u0645\u0646\u062a\u0638\u0631 \u062a\u0648\u0631\u064a\u062f\u0647\u0627. \u0648\u062a\u064f\u062c\u062f\u0648\u0644 \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u0646\u062a\u0638\u0631 \u062a\u0648\u0631\u064a\u062f\u064b\u0627 \u0645\u0646 \u0627\u0644\u0645\u0648\u0631\u0651\u062f \u0628\u0639\u062f \u0645\u0648\u0639\u062f \u0648\u0635\u0648\u0644\u0647\u060c \u0628\u062f\u0644\u064b\u0627 \u0645\u0646 \u0623\u0646 \u062a\u062a\u0648\u0642\u0641 \u0641\u064a \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group fx-pain__card ind-icard\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<span class=\"ind-chip ind-chip--green\" aria-hidden=\"true\"><svg viewBox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.8\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><circle cx=\"9\" cy=\"8\" r=\"3\"\/><path d=\"M3 20a6 6 0 0 1 12 0\"\/><path d=\"M16 6a3 3 0 0 1 0 6M21 20a6 6 0 0 0-4-5.7\"\/><\/svg><\/span>\n\n\n<p class=\"fx-pain__t\">\u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u0644\u0645\u0634\u063a\u0651\u0644\u064a\u0646.<\/p>\n\n\n<p class=\"fx-pain__b\">\u064a\u0631\u0649 \u0643\u0644 \u0645\u0634\u063a\u0651\u0644 \u0645\u0647\u0627\u0645\u0647 \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0639\u0644\u0649 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a\u060c \u0648\u064a\u0633\u062c\u0651\u0644 \u0627\u0644\u0639\u0645\u0644 \u0623\u062b\u0646\u0627\u0621 \u062a\u0646\u0641\u064a\u0630\u0647. \u0648\u064a\u062a\u0627\u0628\u0639 \u0627\u0644\u0645\u0643\u062a\u0628 \u062a\u0642\u062f\u0651\u0645 \u0627\u0644\u0639\u0645\u0644 \u0644\u062d\u0638\u064a\u064b\u0627\u060c \u0648\u062a\u064f\u0639\u0627\u062f \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0625\u0644\u0649 NetSuite.<\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0622\u0631\u0627\u0621 \u0627\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0641\u064a SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0641\u064a UTU\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629 \u0641\u064a \u0623\u0648\u0644\u0641\u064a\u0644\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 \u0633<\/b><span>\u0645\u0646 \u0627\u0644\u062a\u0648\u0641\u064a\u0631 \u0623\u0633\u0628\u0648\u0639\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0646\u0642\u0644 SkyPlanner \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062f\u064a\u0646\u0627 \u0645\u0646 \u062c\u062f\u0627\u0648\u0644 Excel \u0625\u0644\u0649 \u062a\u062d\u0633\u064a\u0646 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062d\u0638\u064a\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki\u060c \u0623\u062e\u0635\u0627\u0626\u064a \u0633\u0644\u0633\u0644\u0629 \u0627\u0644\u0625\u0645\u062f\u0627\u062f<\/b><br>UTU \u00b7 \u0644\u0648\u062d\u0627\u062a \u0627\u0644\u062a\u0648\u0632\u064a\u0639 \u0648\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0641\u0635\u0644 \u0648\u0627\u0644\u062a\u0648\u0635\u064a\u0644 \u0627\u0644\u0643\u0647\u0631\u0628\u0627\u0626\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u064a\u0648\u0641\u0651\u0631 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0633\u0627\u0639\u062a\u064a\u0646 (2) \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u0643\u0644 \u0623\u0633\u0628\u0648\u0639\u060c \u0648\u062a\u0635\u0644 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 \u062e\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u062b\u0648\u0627\u0646\u064d.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/utu\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u064a\u0631\u062a\u062f\u0648\u0646 \u0645\u0644\u0627\u0628\u0633 \u0627\u0644\u063a\u0631\u0641 \u0627\u0644\u0646\u0638\u064a\u0641\u0629 \u0639\u0644\u0649 \u062e\u0637 \u062a\u0639\u0628\u0626\u0629 \u0627\u0644\u0632\u062c\u0627\u062c\u0627\u062a \u0641\u064a \u0645\u0635\u0646\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629 \u0627\u0644\u062a\u0627\u0628\u0639 \u0644\u0634\u0631\u0643\u0629 Laboratory &amp; Allied \u0641\u064a \u0646\u064a\u0631\u0648\u0628\u064a\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>\u0641\u064a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga\u060c \u0631\u0626\u064a\u0633 \u0642\u0633\u0645 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0645\u0639\u0644\u0648\u0645\u0627\u062a<\/b><br>Laboratory &amp; Allied \u00b7 \u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0623\u062f\u0648\u064a\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u0627\u0631\u062a\u0641\u0639\u062a \u0643\u0641\u0627\u0621\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0628\u0646\u0633\u0628\u0629 90%\u060c \u0648\u064a\u0633\u062a\u063a\u0631\u0642 \u0625\u0639\u062f\u0627\u062f \u062e\u0637\u0629 \u0645\u062d\u0633\u0651\u0646\u0629 \u0644\u062b\u0644\u0627\u062b\u0629 \u0623\u0634\u0647\u0631 \u062a\u0634\u0645\u0644 \u062c\u0645\u064a\u0639 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0642\u0644 \u0645\u0646 30 \u062f\u0642\u064a\u0642\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/laboratory-allied\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"\u0645\u0646\u0638\u0631 \u062c\u0648\u064a \u0644\u0645\u0635\u0646\u0639 Piristeel \u0644\u0645\u0639\u062f\u0627\u062a \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0641\u064a \u0643\u0627\u0648\u0647\u0627\u0641\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99.2%<\/b><span>\u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u062a\u0627\u062d SkyPlanner \u0631\u0624\u064a\u0629 \u0648\u0627\u0636\u062d\u0629 \u0644\u062a\u062d\u062f\u064a\u062f \u0627\u0644\u0627\u062e\u062a\u0646\u0627\u0642\u0627\u062a\u060c \u0648\u062c\u0639\u0644 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0623\u0643\u062b\u0631 \u0648\u0636\u0648\u062d\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori\u060c \u0645\u062f\u064a\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/b><br>Piristeel \u00b7 \u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0633\u0644\u0627\u0645\u0629 \u0639\u0644\u0649 \u0627\u0644\u0623\u0633\u0637\u062d \u0648\u062a\u0635\u0631\u064a\u0641 \u0645\u064a\u0627\u0647 \u0627\u0644\u0623\u0645\u0637\u0627\u0631<\/p>\n\n\n<p class=\"ind-cust__result\">\u0628\u0644\u063a\u062a \u0646\u0633\u0628\u0629 \u0627\u0644\u0627\u0644\u062a\u0632\u0627\u0645 \u0628\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u064a\u0645 99.2% \u0647\u0630\u0627 \u0627\u0644\u0639\u0627\u0645\u060c \u0648\u062a\u0648\u0641\u0651\u0631 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 \u0623\u0631\u0628\u0639 \u0633\u0627\u0639\u0627\u062a \u0645\u0646 \u0648\u0642\u062a \u0627\u0644\u0639\u0645\u0644 \u064a\u0648\u0645\u064a\u064b\u0627.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/piristeel\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a \u0644\u0634\u0631\u0643\u0629 Mamec\u060c \u0641\u064a \u0635\u0627\u0644\u0629 \u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0634\u0631\u0643\u0629 \u0641\u064a \u0644\u0648\u0647\u064a\u0627\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>\u0622\u0644\u0627\u0641 (1,000s)<\/b><span>\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u064f\u062c\u062f\u0648\u0644 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201c\u0623\u0635\u0628\u062d\u062a \u0633\u064a\u0637\u0631\u062a\u0646\u0627 \u0639\u0644\u0649 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u062e\u062a\u0644\u0641\u0629\u060c \u0648\u0627\u0646\u062a\u0642\u0644 \u0641\u0647\u0645\u0646\u0627 \u0644\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0625\u0644\u0649 \u0645\u0633\u062a\u0648\u0649 \u0645\u062e\u062a\u0644\u0641 \u062a\u0645\u0627\u0645\u064b\u0627.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen\u060c \u0627\u0644\u0631\u0626\u064a\u0633 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u064a<\/b><br>Mamec \u00b7 \u062e\u0644\u0627\u0637\u0627\u062a \u0648\u0645\u0636\u062e\u0627\u062a \u0635\u0646\u0627\u0639\u064a\u0629 \u0648\u062a\u0635\u0646\u064a\u0639 \u062a\u0639\u0627\u0642\u062f\u064a \u0628\u062a\u0642\u0646\u064a\u0627\u062a \u0645\u062a\u0642\u062f\u0645\u0629<\/p>\n\n\n<p class=\"ind-cust__result\">\u062a\u064f\u062c\u062f\u0648\u0644 \u0622\u0644\u0627\u0641 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0625\u062a\u0627\u062d\u0629 \u0631\u0624\u064a\u0629 \u0644\u062d\u0638\u064a\u0629 \u0644\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u062c\u0645\u064a\u0639 \u0623\u0642\u0633\u0627\u0645 \u0627\u0644\u0634\u0631\u0643\u0629.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/ar\/%d9%82%d8%b5%d8%b5-%d8%a7%d9%84%d8%b9%d9%85%d9%84%d8%a7%d8%a1\/mamec\/\">\u0627\u0642\u0631\u0623 \u0631\u0623\u064a Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-skyplanner-works-with-netsuite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u064a\u0639\u0645\u0644 SkyPlanner \u0645\u0639 NetSuite<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how ind-how\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">1<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u064a\u0631\u0633\u0644 NetSuite \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u062a\u064f\u0646\u0642\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621 \u0625\u0644\u0649 SkyPlanner.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">2<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u064a\u064f\u0646\u0634\u0626 SkyPlanner \u0627\u0644\u062c\u062f\u0648\u0644 \u0648\u064a\u064f\u0628\u0642\u064a\u0647 \u0645\u062d\u062f\u0651\u064e\u062b\u064b\u0627.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u064a\u062e\u0637\u0637 \u0645\u062d\u0631\u0651\u0643 Arcturus \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u062b\u0648\u0627\u0646\u064d\u060c \u0648\u064a\u0639\u064a\u062f \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0645\u0639 \u062a\u063a\u064a\u0651\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fxv-how__step\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"fxv-how__num\" aria-hidden=\"true\">3<\/div>\n\n\n<h3 class=\"wp-block-heading fxv-how__t\">\u062a\u064f\u0639\u0627\u062f \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0648\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0633\u062c\u0651\u0644 \u0625\u0644\u0649 NetSuite.<\/h3>\n\n\n<p class=\"fxv-how__b\">\u062a\u064f\u0639\u0627\u062f \u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0628\u062f\u0621 \u0648\u0627\u0644\u0627\u0646\u062a\u0647\u0627\u0621 \u0627\u0644\u0645\u062e\u0637\u0637\u0629 \u0625\u0644\u0649 \u0639\u0645\u0644\u064a\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite\u060c \u0648\u062a\u064f\u0631\u062d\u0651\u064e\u0644 \u0627\u0644\u0633\u0627\u0639\u0627\u062a \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a \u0627\u0644\u0645\u0633\u062c\u0651\u0644\u0629 \u0643\u0633\u062c\u0644\u0627\u062a \u0625\u0646\u062c\u0627\u0632 \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n\n\n<svg class=\"fxv-how__arrow\" width=\"26\" height=\"20\" viewBox=\"0 0 26 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M2 10h20m0 0l-7-7m7 7l-7 7\" stroke=\"currentColor\" stroke-width=\"2.4\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u064a\u062a\u0635\u0644 SkyPlanner \u0639\u0628\u0631 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 REST \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0646\u0638\u0627\u0645 NetSuite \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 OAuth 2.0\u060c \u0644\u0630\u0644\u0643 \u0644\u0627 \u062d\u0627\u062c\u0629 \u0625\u0644\u0649 SuiteApp. \u064a\u062e\u062a\u0644\u0641 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 NetSuite \u0645\u0646 \u0645\u0635\u0646\u0639 \u0625\u0644\u0649 \u0622\u062e\u0631\u060c \u0644\u0630\u0627 \u064a\u0636\u0628\u0637 \u0641\u0631\u064a\u0642 SkyPlanner \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0645\u0627 \u064a\u0646\u0627\u0633\u0628 \u0625\u0639\u062f\u0627\u062f\u0627\u062a\u0643 \u062e\u0644\u0627\u0644 \u0645\u0631\u062d\u0644\u0629 \u0627\u0644\u0625\u0639\u062f\u0627\u062f\u060c \u0648\u064a\u0642\u062f\u0651\u0645 \u0627\u0644\u062f\u0639\u0645 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a. \u0648\u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0644\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0648\u0641\u0642\u064b\u0627 \u0644\u0633\u064a\u0631 \u0639\u0645\u0644\u0643 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643. \u0648\u064a\u0645\u0643\u0646 \u0623\u064a\u0636\u064b\u0627 \u0644\u0634\u0631\u064a\u0643 NetSuite \u0644\u062f\u064a\u0643 \u0623\u0648 \u0644\u0645\u0637\u0648\u0651\u0631\u064a\u0643 \u0628\u0646\u0627\u0621 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 API \u0627\u0644\u0645\u0648\u062b\u0651\u0642\u0629 \u0645\u0646 SkyPlanner (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">\u0645\u0631\u062c\u0639 API<\/a>).<\/p>\n\n\n<p>\u062a\u062c\u062f \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644 \u0627\u0644\u062a\u0642\u0646\u064a\u0629 \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%af%d9%84%d9%8a%d9%84-%d8%aa%d9%83%d8%a7%d9%85%d9%84\/\">\u062f\u0644\u064a\u0644 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0639 NetSuite \u0644\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/a>.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"why-netsuite-s-own-planning-is-not-enough\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0644\u0645\u0627\u0630\u0627 \u0644\u0627 \u062a\u0643\u0641\u064a \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a NetSuite \u0648\u062d\u062f\u0647\u0627\u061f<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0641\u062a\u0631\u0636 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0641\u064a \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a NetSuite \u0623\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629\u060c \u0648<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/netsuite\/ns-online-help\/bridgehead_1508338236.html\">\u062a\u0630\u0643\u0631 Oracle<\/a> \u0623\u0646\u0647\u0627 &#8220;doesn&#8217;t account for current work center capacity or resource use.&#8221; (\u0644\u0627 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0644\u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0645\u0648\u0627\u0631\u062f). \u064a\u0636\u064a\u0641 Advanced Manufacturing SuiteApp \u0645\u064a\u0632\u0629 Finite Scheduling\u060c \u0644\u0643\u0646 \u0627\u0644\u0645\u062e\u0637\u0651\u0650\u0637 \u064a\u0638\u0644 \u0645\u0633\u0624\u0648\u0644\u064b\u0627 \u0639\u0646 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u064a\u062f\u0648\u064a\u064b\u0627. \u0648\u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u064a\u0648\u0645\u064a\u060c \u064a\u0639\u0646\u064a \u0630\u0644\u0643:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u062a\u064f\u062d\u0645\u0651\u064e\u0644 \u0627\u0644\u0622\u0644\u0627\u062a \u0641\u0648\u0642 \u0637\u0627\u0642\u062a\u0647\u0627 \u0641\u064a \u0627\u0644\u062e\u0637\u0629.<\/strong> \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u062a\u0648\u0642\u064a\u062a \u0643\u0644 \u0623\u0645\u0631 \u0625\u0646\u062a\u0627\u062c \u0643\u0645\u0627 \u0644\u0648 \u0643\u0627\u0646 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u062e\u0635\u0651\u0635\u064b\u0627 \u0644\u0647 \u0648\u062d\u062f\u0647. \u0648\u0642\u062f \u062a\u064f\u062c\u062f\u0648\u0644 \u0639\u0634\u0631\u0629 \u0637\u0644\u0628\u0627\u062a \u0645\u0633\u062a\u062d\u0642\u0629 \u064a\u0648\u0645 \u0627\u0644\u062c\u0645\u0639\u0629 \u062c\u0645\u064a\u0639\u0647\u0627 \u0639\u0644\u0649 \u0645\u0631\u0643\u0632 \u0639\u0645\u0644 \u0648\u0627\u062d\u062f \u064a\u0648\u0645 \u0627\u0644\u062e\u0645\u064a\u0633.<\/li>\n\n\n<li><strong>\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0642\u064a\u0645\u0629 \u062b\u0627\u0628\u062a\u0629 \u0648\u0627\u062d\u062f\u0629.<\/strong> \u064a\u064f\u062d\u062f\u0651\u064e\u062f \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0628\u0642\u064a\u0645\u0629 \u0648\u0627\u062d\u062f\u0629 \u0644\u0643\u0644 \u062e\u0637\u0648\u0629 \u0641\u064a \u0645\u0633\u0627\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0628\u0635\u0631\u0641 \u0627\u0644\u0646\u0638\u0631 \u0639\u0645\u0651\u0627 \u0623\u064f\u0646\u062a\u062c \u0642\u0628\u0644\u0647\u0627. \u0644\u0630\u0627 \u0644\u0627 \u064a\u064f\u0638\u0647\u0631 \u0627\u0644\u062c\u062f\u0648\u0644 \u0623\u064a \u062a\u0648\u0641\u064a\u0631 \u0639\u0646\u062f \u062a\u062d\u0633\u064a\u0646 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0645\u0647\u0627\u0645.<\/li>\n\n\n<li><strong>\u0627\u0644\u0645\u062e\u0637\u0651\u0650\u0637 \u0647\u0648 \u0645\u0646 \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644.<\/strong> \u0645\u0639 Advanced Manufacturing\u060c \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u0645\u062e\u0637\u0651\u0650\u0637 \u062a\u0631\u062a\u064a\u0628 \u0625\u0637\u0644\u0627\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0648\u064a\u0639\u064a\u062f \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0625\u0637\u0644\u0627\u0642 \u0628\u0639\u062f \u0643\u0644 \u0637\u0644\u0628 \u0639\u0627\u062c\u0644 \u0623\u0648 \u0639\u0637\u0644.<\/li>\n\n<\/ul>\n\n\n<p>\u062a\u062c\u062f \u0634\u0631\u062d\u064b\u0627 \u0644\u0643\u0644 \u0647\u0630\u0647 \u0627\u0644\u0642\u064a\u0648\u062f \u0641\u064a <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/%d8%aa%d8%ae%d8%b7%d9%8a%d8%b7-%d8%a7%d9%84%d8%a5%d9%86%d8%aa%d8%a7%d8%ac\/\">\u0647\u0644 \u064a\u0648\u0641\u0651\u0631 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u061f<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"netsuite-alone-vs-with-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0645\u0642\u0627\u0631\u0646\u0629 \u0628\u064a\u0646 NetSuite \u0648\u062d\u062f\u0647 \u0648\u0645\u0639 SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th><\/th><th>NetSuite \u0648\u062d\u062f\u0647<\/th><th>NetSuite \u0645\u0639 SkyPlanner APS<\/th><\/tr><\/thead><tbody><tr><td>\u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629<\/td><td>\u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629 \u0641\u064a \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629\u061b \u064a\u064f\u0645\u062b\u0651\u064e\u0644 \u0645\u0631\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0628\u0639\u062f\u062f \u0648\u062a\u0642\u0648\u064a\u0645 \u0648\u0627\u062d\u062f<\/td><td>\u0637\u0627\u0642\u0629 \u0641\u0639\u0644\u064a\u0629 \u0648\u0648\u0631\u062f\u064a\u0627\u062a \u0644\u0643\u0644 \u0622\u0644\u0629 \u0648\u0641\u0631\u062f \u0648\u0623\u062f\u0627\u0629<\/td><\/tr><tr><td>\u0627\u0644\u062c\u062f\u0648\u0644<\/td><td>\u064a\u064f\u062d\u062f\u0651\u064e\u062f \u062a\u0648\u0642\u064a\u062a \u0643\u0644 \u0623\u0645\u0631 \u0639\u0644\u0649 \u062d\u062f\u0629\u061b \u0648\u0645\u0639 Advanced Manufacturing\u060c \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u0645\u062e\u0637\u0651\u0650\u0637 \u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0625\u0637\u0644\u0627\u0642<\/td><td>\u062c\u062f\u0648\u0644 \u062a\u0641\u0635\u064a\u0644\u064a \u0644\u0643\u0644 \u0639\u0645\u0644\u064a\u0629 \u0641\u064a \u062b\u0648\u0627\u0646\u064d<\/td><\/tr><tr><td>\u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631<\/td><td>\u0648\u0642\u062a \u062a\u0647\u064a\u0626\u0629 \u062b\u0627\u0628\u062a \u0628\u0635\u0631\u0641 \u0627\u0644\u0646\u0638\u0631 \u0639\u0645\u0651\u0627 \u0623\u064f\u0646\u062a\u062c \u0642\u0628\u0644\u0647<\/td><td>\u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f<\/td><\/tr><tr><td>\u0627\u0644\u0645\u0648\u0627\u062f<\/td><td>\u062a\u062d\u062f\u0651\u062f Supply Planning \u0645\u0627 \u064a\u062c\u0628 \u0634\u0631\u0627\u0624\u0647 \u0648\u062a\u0635\u0646\u064a\u0639\u0647<\/td><td>\u062a\u0628\u062f\u0623 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u0646\u062f \u062a\u0648\u0627\u0641\u0631 \u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0623\u0648 \u0648\u0635\u0648\u0644 \u0627\u0644\u062a\u0648\u0631\u064a\u062f\u0627\u062a \u0627\u0644\u0645\u0646\u062a\u0638\u0631\u0629<\/td><\/tr><tr><td>\u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a<\/td><td>\u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0645\u064f\u0637\u0644\u064e\u0642\u0629 \u0648\u0625\u0639\u0627\u062f\u0629 \u062a\u0646\u0641\u064a\u0630 \u0627\u0644\u0625\u0637\u0644\u0627\u0642<\/td><td>\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0644\u0644\u0645\u0635\u0646\u0639 \u0628\u0623\u0643\u0645\u0644\u0647 \u0648\u0641\u0642 \u0623\u0648\u0644\u0648\u064a\u0627\u062a\u0643<\/td><\/tr><tr><td>\u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/td><td>\u062a\u064f\u062f\u062e\u064e\u0644 \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0625\u0646\u062c\u0627\u0632 \u0641\u064a NetSuite<\/td><td>\u064a\u0631\u0649 \u0627\u0644\u0645\u0634\u063a\u0651\u0644\u0648\u0646 \u0645\u0647\u0627\u0645\u0647\u0645 \u0627\u0644\u0642\u0627\u062f\u0645\u0629 \u0648\u064a\u0633\u062c\u0651\u0644\u0648\u0646 \u0627\u0644\u0639\u0645\u0644 \u0639\u0644\u0649 \u0647\u0627\u062a\u0641 \u0623\u0648 \u062c\u0647\u0627\u0632 \u0644\u0648\u062d\u064a<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"how-to-choose-a-scheduler-for-netsuite\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u062a\u062e\u062a\u0627\u0631 \u0623\u062f\u0627\u0629 \u062c\u062f\u0648\u0644\u0629 \u0644\u0646\u0638\u0627\u0645 NetSuite<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>\u062a\u0646\u0627\u0633\u0628 \u0623\u062f\u0648\u0627\u062a \u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0641\u064a NetSuite \u0645\u0635\u0646\u0639\u064b\u0627 \u064a\u0633\u062a\u062e\u062f\u0645 Advanced Manufacturing \u0628\u0645\u0633\u0627\u0631\u0627\u062a \u0625\u0646\u062a\u0627\u062c \u0628\u0633\u064a\u0637\u0629 \u0648\u064a\u064f\u0637\u0644\u0642 \u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0623\u0633\u0628\u0648\u0639\u064a\u064b\u0627.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u064a\u0643\u0648\u0646 \u0648\u0642\u062a \u0627\u0644\u062a\u063a\u064a\u064a\u0631 \u0647\u0648 \u0645\u0627 \u064a\u062d\u062f\u0651\u062f \u062d\u062c\u0645 \u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u064a\u0631\u062a\u0651\u0628 SkyPlanner \u0627\u0644\u0645\u0647\u0627\u0645 \u0644\u062a\u0642\u0644\u064a\u0644 \u0625\u062c\u0645\u0627\u0644\u064a \u0648\u0642\u062a \u0627\u0644\u062a\u0647\u064a\u0626\u0629 \u0625\u0644\u0649 \u0623\u062f\u0646\u0649 \u062d\u062f.<\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u062a\u0643\u0648\u0646 \u0627\u0644\u0623\u062f\u0648\u0627\u062a \u0648\u0641\u0631\u0642 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u0634\u062a\u0631\u0643\u0629 \u0647\u064a \u0645\u0627 \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646 \u062a\u0646\u0641\u064a\u0630\u0647\u0627 \u062a\u0627\u0644\u064a\u064b\u0627.<\/strong><\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0639\u0646\u062f\u0645\u0627 \u064a\u0643\u0648\u0646 \u0648\u0635\u0648\u0644 \u0627\u0644\u0645\u0648\u0627\u062f \u0647\u0648 \u0645\u0627 \u064a\u062d\u062f\u0651\u062f \u0627\u0644\u0645\u0647\u0645\u0629 \u0627\u0644\u062a\u064a \u062a\u0628\u062f\u0623.<\/strong><\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0625\u0630\u0627 \u0643\u0627\u0646\u062a \u062e\u0637\u062a\u0643 \u062a\u062a\u063a\u064a\u0631 \u0639\u062f\u0629 \u0645\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0623\u0633\u0628\u0648\u0639.<\/strong> \u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062a\u062e\u0637\u064a\u0637\u060c \u0648\u062a\u064f\u0631\u0633\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u062c\u062f\u064a\u062f\u0629 \u0625\u0644\u0649 NetSuite.<\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0625\u0630\u0627 \u0643\u0646\u062a \u062a\u0631\u064a\u062f \u0627\u0644\u062c\u0645\u0639 \u0628\u064a\u0646 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u0648\u062a\u0642\u0627\u0631\u064a\u0631 \u0635\u0627\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a \u0623\u062f\u0627\u0629 \u0648\u0627\u062d\u062f\u0629.<\/strong><\/li>\n\n\n<li><strong>\u0627\u062e\u062a\u0631 SkyPlanner \u0625\u0630\u0627 \u0643\u0646\u062a \u0644\u0627 \u062a\u0631\u064a\u062f \u0625\u0636\u0627\u0641\u0629 Advanced Manufacturing \u0644\u0645\u062c\u0631\u062f \u0627\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0627\u0644\u062c\u062f\u0648\u0644\u0629.<\/strong><\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"how-to-get-started\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0643\u064a\u0641 \u062a\u0628\u062f\u0623<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629.<\/strong> 30 \u064a\u0648\u0645\u064b\u0627\u060c \u0648\u0645\u0627 \u064a\u0635\u0644 \u0625\u0644\u0649 20 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u062c\u0645\u064a\u0639 \u0645\u064a\u0632\u0627\u062a Basic\u060c \u062f\u0648\u0646 \u0627\u0644\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u0628\u0637\u0627\u0642\u0629 \u0627\u0626\u062a\u0645\u0627\u0646.<\/li>\n\n\n<li><strong>\u0623\u0639\u062f\u0651 \u0646\u0645\u0648\u0630\u062c\u064b\u0627 \u0644\u0625\u0646\u062a\u0627\u062c\u0643.<\/strong> \u0623\u0636\u0641 \u0627\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646 \u0648\u0627\u0644\u0648\u0631\u062f\u064a\u0627\u062a \u0641\u064a SkyPlanner\u060c \u0623\u0648 \u0627\u0633\u062a\u0648\u0631\u062f \u0628\u064a\u0627\u0646\u0627\u062a\u0647\u0627. \u0648\u062a\u062a\u0648\u0641\u0631 \u0645\u0633\u0627\u0639\u062f\u0629 \u0644\u0628\u062f\u0621 \u0627\u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645.<\/li>\n\n\n<li><strong>\u062d\u0645\u0651\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/strong> \u0635\u062f\u0651\u0631 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0625\u0644\u0649 Excel \u0645\u0646 \u0628\u062d\u062b \u0645\u062d\u0641\u0648\u0638 \u0641\u064a NetSuite\u060c \u062b\u0645 \u0627\u0633\u062a\u0648\u0631\u062f\u0647\u0627 \u0648\u0642\u0627\u0631\u0646 \u062c\u062f\u0648\u0644 SkyPlanner \u0628\u062e\u0637\u062a\u0643 \u0627\u0644\u062d\u0627\u0644\u064a\u0629.<\/li>\n\n\n<li><strong>\u0627\u0631\u0628\u0637 NetSuite.<\/strong> \u064a\u062a\u0648\u0644\u0649 \u0641\u0631\u064a\u0642 SkyPlanner \u0625\u0639\u062f\u0627\u062f \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u062b\u0646\u0627\u0626\u064a \u0627\u0644\u0627\u062a\u062c\u0627\u0647\u060c \u0648\u064a\u0642\u062f\u0645 \u0627\u0644\u062f\u0639\u0645 \u0628\u0639\u062f \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/li>\n\n<\/ol>\n\n\n<p><strong>\u0627\u0644\u0623\u0633\u0639\u0627\u0631.<\/strong> \u062a\u064f\u062d\u062a\u0633\u0628 \u0631\u0633\u0648\u0645 \u0627\u0644\u0628\u0627\u0642\u0627\u062a \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644\u060c \u0648\u064a\u0645\u0643\u0646\u0643 \u0625\u0636\u0627\u0641\u0629 \u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644 \u0623\u0648 \u0625\u0632\u0627\u0644\u062a\u0647\u0627 \u0623\u0648 \u0625\u0644\u063a\u0627\u0621 \u0627\u0644\u0627\u0634\u062a\u0631\u0627\u0643 \u0641\u064a \u0623\u064a \u0648\u0642\u062a. \u0631\u0627\u062c\u0639 <a href=\"\/ar\/%d8%a7%d9%84%d8%aa%d8%b3%d8%b9%d9%8a%d8%b1\/\">\u0627\u0644\u0623\u0633\u0639\u0627\u0631<\/a> \u0644\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u0627\u0644\u062a\u0641\u0627\u0635\u064a\u0644.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%aa%d8%ac%d8%b1%d8%a8%d8%a9\/\">\u0627\u0628\u062f\u0623 \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u0645\u062c\u0627\u0646\u064a\u0629<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/ar\/%d8%a7%d8%aa%d8%b5%d9%84-%d8%a8%d8%a7%d9%84%d9%85%d8%a8%d9%8a%d8%b9%d8%a7%d8%aa\/\">\u062a\u0648\u0627\u0635\u0644 \u0645\u0639 \u0627\u0644\u0645\u0628\u064a\u0639\u0627\u062a<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">\u0627\u0644\u0623\u0633\u0626\u0644\u0629 \u0627\u0644\u0634\u0627\u0626\u0639\u0629<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062f\u0639\u0645 NetSuite \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062c\u0632\u0626\u064a\u064b\u0627. \u062a\u064f\u062c\u062f\u0648\u0650\u0644 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a NetSuite \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0639\u0644\u0649 \u0627\u0641\u062a\u0631\u0627\u0636 \u0623\u0646 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u063a\u064a\u0631 \u0645\u062d\u062f\u0648\u062f\u0629. \u0648\u064a\u0636\u064a\u0641 \u062a\u0637\u0628\u064a\u0642 Advanced Manufacturing SuiteApp \u0645\u064a\u0632\u0629 Finite Scheduling\u060c \u0627\u0644\u062a\u064a \u064a\u062d\u062f\u062f \u0641\u064a\u0647\u0627 \u0627\u0644\u0645\u062e\u0637\u0637 \u062a\u0633\u0644\u0633\u0644 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u064a\u064f\u0635\u062f\u0631\u0647\u0627 \u0644\u0644\u062a\u0646\u0641\u064a\u0630. \u0623\u0645\u0627 SkyPlanner APS \u0641\u064a\u0636\u064a\u0641 \u062a\u062d\u062f\u064a\u062f \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0648\u0625\u0639\u0627\u062f\u0629 \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627\u060c \u0645\u0639 \u0645\u0631\u0627\u0639\u0627\u0629 \u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0648\u0631\u062f\u064a\u0629 \u0648\u0645\u0634\u063a\u0651\u0644.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062a\u062b\u0628\u064a\u062a \u0623\u064a \u0634\u064a\u0621 \u0641\u064a NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627 \u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u062a\u062b\u0628\u064a\u062a \u0623\u064a \u062a\u0637\u0628\u064a\u0642 SuiteApp. \u064a\u0639\u0645\u0644 SkyPlanner \u0641\u064a \u0627\u0644\u0633\u062d\u0627\u0628\u0629 \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 NetSuite\u060c \u0648\u064a\u062a\u0635\u0644 \u0628\u0647 \u0639\u0628\u0631 \u062e\u062f\u0645\u0627\u062a \u0627\u0644\u0648\u064a\u0628 REST \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 OAuth 2.0. \u0648\u0625\u0630\u0627 \u0623\u0631\u062f\u062a\u0645 \u0648\u0635\u0648\u0644 \u0627\u0644\u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0639\u0644\u0649 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0625\u0644\u0649 SkyPlanner \u0641\u0648\u0631 \u062d\u0641\u0638\u0647\u0627\u060c \u0641\u064a\u062a\u0648\u0644\u0649 \u0625\u0631\u0633\u0627\u0644\u0647\u0627 \u0628\u0631\u0646\u0627\u0645\u062c \u0646\u0635\u064a \u0635\u063a\u064a\u0631 \u0645\u0631\u062a\u0628\u0637 \u0628\u0623\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062d\u0644 SkyPlanner \u0645\u062d\u0644 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0641\u064a NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627\u060c \u0628\u0644 \u064a\u0639\u0645\u0644 \u0645\u0643\u0645\u0651\u0644\u064b\u0627 \u0644\u0647\u0627. \u062a\u0638\u0644 \u0625\u062f\u0627\u0631\u0629 \u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0642\u0648\u0627\u0626\u0645 \u0627\u0644\u0645\u0648\u0627\u062f \u0648\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0645\u062f\u0627\u062f \u0648\u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0645\u062e\u0632\u0648\u0646 \u0648\u0627\u0644\u0634\u0624\u0648\u0646 \u0627\u0644\u0645\u0627\u0644\u064a\u0629 \u0641\u064a NetSuite. \u0648\u064a\u062a\u0648\u0644\u0649 SkyPlanner \u062c\u062f\u0648\u0644\u0629 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629\u060c \u062b\u0645 \u064a\u0639\u064a\u062f \u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0625\u0644\u0649 NetSuite.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0645\u0627 \u062a\u0643\u0644\u0641\u0629 SkyPlanner \u0644\u0634\u0631\u0643\u0629 \u062a\u0635\u0646\u064a\u0639 \u062a\u0633\u062a\u062e\u062f\u0645 NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u062a\u0628\u062f\u0623 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0648\u062a\u0634\u0645\u0644 5 \u0645\u062d\u0637\u0627\u062a \u0639\u0645\u0644\u060c \u0645\u0639 \u0625\u0636\u0627\u0641\u0629 20 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0625\u0636\u0627\u0641\u064a\u0629. \u0648\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0647\u064a \u0645\u0648\u0631\u062f \u0625\u0646\u062a\u0627\u062c \u0644\u0647 \u0642\u0627\u0626\u0645\u0629 \u0645\u0647\u0627\u0645 \u0645\u062c\u062f\u0648\u0644\u0629 \u062e\u0627\u0635\u0629 \u0628\u0647. \u0648\u064a\u064f\u0642\u062f\u0651\u064e\u0645 \u0639\u0631\u0636 \u0633\u0639\u0631 \u0627\u0644\u062a\u0643\u0627\u0645\u0644 \u0645\u0633\u0628\u0642\u064b\u0627 \u0648\u0641\u0642 \u0639\u0645\u0644\u064a\u0627\u062a\u0643\u0645 \u0648\u0627\u062d\u062a\u064a\u0627\u062c\u0627\u062a\u0643\u0645\u060c \u0625\u0644\u0649 \u062c\u0627\u0646\u0628 \u062e\u0637\u0629 \u0627\u0634\u062a\u0631\u0627\u0643\u0643\u0645\u060c \u0644\u062a\u062a\u0636\u062d \u0644\u0643\u0645 \u0627\u0644\u062a\u0643\u0644\u0641\u0629 \u0627\u0644\u0643\u0627\u0645\u0644\u0629 \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0643\u0645 \u064a\u0633\u062a\u063a\u0631\u0642 \u0627\u0644\u062a\u0646\u0641\u064a\u0630\u061f<\/summary>\n<p class=\"sp-faq__a\">\u064a\u0643\u062a\u0645\u0644 \u0627\u0644\u062a\u0646\u0641\u064a\u0630 \u0639\u0627\u062f\u0629\u064b \u062e\u0644\u0627\u0644 \u0623\u0633\u0627\u0628\u064a\u0639 \u0645\u0646 \u0628\u062f\u0621 \u0627\u0644\u062a\u0647\u064a\u0626\u0629\u060c \u062d\u062a\u0649 \u0644\u062f\u0649 \u0627\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0643\u0628\u064a\u0631\u0629. \u064a\u062d\u062f\u062f \u0627\u0644\u0641\u0631\u064a\u0642 \u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0644\u062f\u064a\u0643\u0645 \u0648\u064a\u064f\u0639\u062f\u0651\u0647\u0627 \u0641\u064a \u0627\u0644\u0646\u0638\u0627\u0645\u060c \u0648\u064a\u0631\u0628\u0637 \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621\u060c \u062b\u0645 \u064a\u0639\u064a\u062f \u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0645\u0648\u0627\u0639\u064a\u062f \u0627\u0644\u0645\u062e\u0637\u0637\u0629. \u0648\u064a\u064f\u062e\u062a\u0628\u0631 \u0643\u0644 \u0634\u064a\u0621 \u0628\u0627\u0644\u0627\u0633\u062a\u0646\u0627\u062f \u0625\u0644\u0649 \u062e\u0637\u062a\u0643\u0645 \u0627\u0644\u062d\u0627\u0644\u064a\u0629 \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644 \u0627\u0644\u0641\u0639\u0644\u064a.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u0645\u0643\u0646\u0646\u0627 \u062a\u062c\u0631\u0628\u0629 SkyPlanner \u0642\u0628\u0644 \u0631\u0628\u0637\u0647 \u0628\u0646\u0638\u0627\u0645 NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. \u062a\u0639\u062a\u0645\u062f \u0627\u0644\u062a\u062c\u0631\u0628\u0629 \u0627\u0644\u062a\u064a \u062a\u0633\u062a\u0645\u0631 30 \u064a\u0648\u0645\u064b\u0627 \u0639\u0644\u0649 \u0628\u064a\u0627\u0646\u0627\u062a \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0627\u0644\u0645\u0641\u062a\u0648\u062d\u0629 \u0648\u0627\u0644\u0623\u0635\u0646\u0627\u0641 \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u0645\u064f\u0635\u062f\u0651\u064e\u0631\u0629 \u0645\u0646 NetSuite. \u0648\u0628\u0630\u0644\u0643 \u062a\u0637\u0651\u0644\u0639\u0648\u0646 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%a7%d9%84%d9%85%d9%88%d8%a7%d8%b1%d8%af\/finite-capacity-scheduling\/\">\u062e\u0637\u0629 \u0644\u0625\u0646\u062a\u0627\u062c\u0643\u0645 \u062a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646<\/a> \u0642\u0628\u0644 \u0627\u0644\u0628\u062f\u0621 \u0628\u0623\u064a \u0623\u0639\u0645\u0627\u0644 \u062a\u0643\u0627\u0645\u0644.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 Advanced Manufacturing \u0644\u0627\u0633\u062a\u062e\u062f\u0627\u0645 SkyPlanner \u0645\u0639 NetSuite\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0644\u0627. \u064a\u0642\u0631\u0623 SkyPlanner \u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0627\u062a \u0648\u0645\u0631\u0627\u0643\u0632 \u0627\u0644\u0639\u0645\u0644 \u0645\u0646 \u0648\u0638\u0627\u0626\u0641 \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0641\u064a NetSuite\u060c \u0648\u064a\u062a\u0648\u0644\u0649 \u0628\u0646\u0641\u0633\u0647 \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0641\u0642 \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0644\u0644\u0622\u0644\u0627\u062a \u0648\u0627\u0644\u0639\u0627\u0645\u0644\u064a\u0646. \u0648\u0625\u0630\u0627 \u0643\u0646\u062a\u0645 \u062a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 Advanced Manufacturing \u0628\u0627\u0644\u0641\u0639\u0644\u060c \u0641\u0625\u0646 SkyPlanner \u064a\u062d\u0633\u0628 \u0627\u0644\u062a\u0633\u0644\u0633\u0644 \u0627\u0644\u0630\u064a \u064a\u062d\u062f\u062f\u0647 \u0645\u062e\u0637\u0637\u0643\u0645 \u062d\u0627\u0644\u064a\u064b\u0627 \u064a\u062f\u0648\u064a\u064b\u0627.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>\u0647\u0644 \u064a\u062a\u0648\u0641\u0631 SkyPlanner \u0623\u064a\u0636\u064b\u0627 \u0644\u0646\u0638\u0627\u0645 Oracle Fusion Cloud\u061f<\/summary>\n<p class=\"sp-faq__a\">\u0646\u0639\u0645. NetSuite \u0647\u0648 \u0646\u0638\u0627\u0645 \u062a\u062e\u0637\u064a\u0637 \u0645\u0648\u0627\u0631\u062f \u0627\u0644\u0645\u0624\u0633\u0633\u0627\u062a \u0645\u0646 Oracle \u0644\u0644\u0634\u0631\u0643\u0627\u062a \u0627\u0644\u0646\u0627\u0645\u064a\u0629\u060c \u0628\u064a\u0646\u0645\u0627 \u064a\u062e\u062f\u0645 Oracle Fusion Cloud \u0634\u0631\u0643\u0627\u062a \u0627\u0644\u062a\u0635\u0646\u064a\u0639 \u0627\u0644\u0643\u0628\u064a\u0631\u0629 \u0627\u0644\u062a\u064a \u062a\u062f\u064a\u0631 \u0645\u0635\u0627\u0646\u0639 \u0645\u062a\u0639\u062f\u062f\u0629. \u062a\u0639\u0631\u0651\u0641\u0648\u0627 \u0639\u0644\u0649 <a href=\"\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/oracle-fusion-cloud\/\">SkyPlanner \u0644\u0646\u0638\u0627\u0645 Oracle Fusion Cloud<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle NetSuite SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0641\u0651\u0631 SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 Oracle NetSuite \u062c\u062f\u0648\u0644\u064b\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629\u060c \u0633\u0648\u0627\u0621 \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 Advanced Manufacturing SuiteApp \u0623\u0645 \u0644\u0627. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. skyplanner.ai \u00b7 &#8230; <a title=\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/\" aria-label=\"Read more about SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100693,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-100752","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite | SkyPlanner APS<\/title>\n<meta name=\"description\" content=\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\" \/>\n<meta property=\"og:description\" content=\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-23T13:41:12+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u062f\u0642\u064a\u0642\u0629\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/\",\"name\":\"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite | SkyPlanner APS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"dateModified\":\"2026-10-23T13:41:12+00:00\",\"description\":\"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/netsuite\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite | SkyPlanner APS","description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/","og_locale":"ar_AR","og_type":"article","og_title":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c","og_description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.","og_url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/","og_site_name":"SkyPlanner","article_modified_time":"2026-10-23T13:41:12+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u0648\u0642\u062a \u0627\u0644\u0642\u0631\u0627\u0621\u0629 \u0627\u0644\u0645\u064f\u0642\u062f\u0651\u0631":"1 \u062f\u0642\u064a\u0642\u0629"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/","url":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/","name":"\u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0641\u064a NetSuite | SkyPlanner APS","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","dateModified":"2026-10-23T13:41:12+00:00","description":"\u064a\u0636\u064a\u0641 SkyPlanner APS \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0633\u0627\u0631\u0627\u062a\u0647 \u0641\u064a NetSuite. \u062a\u0643\u0627\u0645\u0644 REST \u0648OAuth 2.0. \u0645\u0646 199 \u20ac \u0634\u0647\u0631\u064a\u064b\u0627\u060c \u0648\u062a\u062c\u0631\u0628\u0629 30 \u064a\u0648\u0645\u064b\u0627.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/netsuite\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"\u062a\u0643\u0627\u0645\u0644\u0627\u062a \u0628\u0631\u0627\u0645\u062c ERP \u0648MES \u0645\u0639 SkyPlanner","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 ERP \u0644\u062f\u064a\u0643","item":"https:\/\/skyplanner.ai\/ar\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ar\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644\u0627\u062a \/ ERP \/ Oracle NetSuite SkyPlanner APS \u0644\u0646\u0638\u0627\u0645 Oracle NetSuite: \u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u064a\u0648\u0641\u0651\u0631 SkyPlanner APS \u0644\u0644\u0645\u0635\u0646\u0651\u0639\u064a\u0646 \u0627\u0644\u0630\u064a\u0646 \u064a\u0633\u062a\u062e\u062f\u0645\u0648\u0646 Oracle NetSuite \u062c\u062f\u0648\u0644\u064b\u0627 \u064a\u0631\u0627\u0639\u064a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u062a\u0627\u062d\u0629 \u0644\u0643\u0644 \u0645\u062d\u0637\u0629 \u0639\u0645\u0644 \u0648\u0645\u0634\u063a\u0651\u0644 \u0648\u0623\u062f\u0627\u0629 \u0648\u0645\u0627\u062f\u0629\u060c \u0633\u0648\u0627\u0621 \u0627\u0633\u062a\u062e\u062f\u0645\u0648\u0627 Advanced Manufacturing SuiteApp \u0623\u0645 \u0644\u0627. \u062a\u0631\u0649 \u0623\u064a\u0646 \u0648\u0645\u062a\u0649 \u062a\u064f\u0646\u0641\u0651\u064e\u0630 \u0643\u0644 \u0645\u0647\u0645\u0629\u060c \u0648\u064a\u0639\u064a\u062f Autopilot \u0627\u0644\u062c\u062f\u0648\u0644\u0629 \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627 \u0639\u0646\u062f \u062d\u062f\u0648\u062b \u062a\u063a\u064a\u064a\u0631\u0627\u062a \u0641\u064a \u0627\u0644\u0625\u0646\u062a\u0627\u062c. skyplanner.ai \u00b7&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=100752"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100752\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/pages\/100693"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=100752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}