{"id":61450,"date":"2025-03-06T12:14:16","date_gmt":"2025-03-06T12:14:16","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/"},"modified":"2025-10-07T11:17:35","modified_gmt":"2025-10-07T11:17:35","password":"","slug":"%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/","title":{"rendered":"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629"},"content":{"rendered":"\n<h4 class=\"wp-block-heading\">\u0628\u0646\u064a\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0645\u062e\u0637\u0637 \u0627\u0644\u0633\u0645\u0627\u0621<\/h4>\n\n<p>\u0642\u0628\u0644 \u0627\u0644\u063a\u0648\u0635 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u0642\u0644\u064a\u0644 \u0639\u0646 \u0628\u0646\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Skyplanner \u0648\u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u062a\u062d\u062a \u0627\u0644\u063a\u0637\u0627\u0621. \u0643\u0644 \u0647\u0630\u0627 \u0633\u064a\u0623\u062a\u064a \u0641\u064a \u0648\u0642\u062a \u0644\u0627\u062d\u0642. <\/p>\n\n<p>\u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062f\u0645\u062c \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628 \/ \u0623\u0645\u0631 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0644\u0648\u0638\u064a\u0641\u0629 \u0641\u064a Skyplanner\u060c \u0641\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u062d \u0623\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0645\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u0642\u0644 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0647\u0630\u0647:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\u0627\u0644\u0623\u0648\u0627\u0645\u0631 \u0627\u0644\u0641\u0627\u0632\u0631<\/li>\n\n\n\n<li>\u0635\u0641\u0648\u0641-\u062a\u0631\u062a\u064a\u0628-\u0635\u0641\u0648\u0641-\u0641\u064a\u0632\u0631<\/li>\n\n\n\n<li>\u0648\u0638\u0627\u0626\u0641-\u0648\u0638\u0627\u0626\u0641-\u0641\u064a\u0632\u0631<\/li>\n<\/ul>\n\n<p>\u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644\u060c \u064a\u062a\u0645 \u062a\u0645\u062b\u064a\u0644 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u062a\u0645 \u0625\u062f\u0631\u0627\u062c\u0647\u0627 \u0641\u064a \u0646\u0642\u0627\u0637 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 \u0647\u0630\u0647 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 \u0645\u0633\u062a\u062e\u062f\u0645 Skyplanner \u0639\u0644\u0649 \u0647\u0630\u0627 \u0627\u0644\u0646\u062d\u0648:<\/p>\n<div class=\"wp-block-image\">\n<figure class=\"alignleft size-large\"><img decoding=\"async\" width=\"1024\" height=\"714\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png\" alt=\"\" class=\"wp-image-55194\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-768x535.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png 1142w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 1.<\/strong>  \u0637\u0644\u0628 (\u0637\u0644\u0628\u0627\u062a-\u0623\u0648\u0627\u0645\u0631-\u0641\u064a\u0632\u0631)<\/figcaption><\/figure>\n<\/div>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"715\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png\" alt=\"\" class=\"wp-image-55228\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-1024x715.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-300x210.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-768x536.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26-360x251.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-26.png 1144w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 2.<\/strong>  \u0639\u0646\u0627\u0635\u0631 \u0627\u0644\u0637\u0644\u0628\u0627\u062a (\u0627\u0644\u0635\u0641\u0648\u0641-\u0627\u0644\u0623\u0648\u0627\u0645\u0631-\u0641\u064a\u0632\u0631 (\u0623\u062d\u0645\u0631))\u060c \u062e\u0637\u0648\u0627\u062a \u0627\u0644\u0639\u0645\u0644\u064a\u0629 (\u0627\u0644\u0648\u0638\u0627\u0626\u0641-\u0641\u064a\u0632\u0631 (\u0623\u062e\u0636\u0631))<\/figcaption><\/figure>\n\n<p>\u0628\u0639\u062f \u0625\u062f\u0631\u0627\u062c \u0637\u0644\u0628\u0627\u062a\u0643 \u0641\u064a Skyplanner\u060c \u0633\u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 <strong>\u062a\u0635\u062f\u064a\u0631\u0647\u0627<\/strong> (\u064a\u0645\u0643\u0646 \u0627\u0644\u0642\u064a\u0627\u0645 \u0628\u0630\u0644\u0643 \u0639\u0628\u0631 \u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0623\u0648 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/phaser-orders\/export-endpoint) \u0625\u0644\u0649 \u0648\u062d\u062f\u0629 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c:<\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"596\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png\" alt=\"\" class=\"wp-image-55288\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-1024x596.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-768x447.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27-360x209.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-27.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 3.<\/strong>  \u0627\u0644\u062a\u0635\u062f\u064a\u0631 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645<\/figcaption><\/figure>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"597\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png\" alt=\"\" class=\"wp-image-55326\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-1024x597.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-300x175.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-768x448.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28-360x210.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-28.png 1074w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 4.<\/strong>  \u0623\u0645\u0631 \u0627\u0644\u062a\u0635\u062f\u064a\u0631 \u0641\u064a \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c<\/figcaption><\/figure>\n\n<p>\u0639\u0646\u062f \u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u064a\u0642\u0648\u0645 Skyplanner \u0628\u0646\u0633\u062e \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644 \u0645\u0646 \u062c\u062f\u0648\u0644 \u0642\u0627\u0639\u062f\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0625\u0644\u0649 \u0622\u062e\u0631. \u0644\u0630\u0644\u0643 \u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062a\u063a\u064a\u064a\u0631 \u0634\u064a\u0621 \u0645\u0627 \u0639\u0644\u0649 \u0633\u0628\u064a\u0644 \u0627\u0644\u0645\u062b\u0627\u0644 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/phaser-orders -endpoint\u060c \u0641\u0623\u0646\u062a \u0628\u062d\u0627\u062c\u0629 \u0625\u0644\u0649 \u062a\u0635\u062f\u064a\u0631 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0645\u0631\u0629 \u0623\u062e\u0631\u0649 \u0644\u062a\u062d\u062f\u064a\u062b\u0647\u0627 \u0641\u064a \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c. \u0647\u0630\u0627 \u064a\u0639\u0646\u064a \u0623\u064a\u0636\u064b\u0627 \u0623\u0646\u0647 \u0645\u0646 \u0623\u062c\u0644 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u0649 \u0627\u0644\u0637\u0644\u0628\u0627\u062a \u0627\u0644\u062a\u064a \u062a\u0631\u0627\u0647\u0627 \u0641\u064a \u0646\u0627\u0641\u0630\u0629 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u064a\u062c\u0628 \u0639\u0644\u064a\u0643 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0645\u062e\u062a\u0644\u0641\u0629 \u0644\u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a!  <\/p>\n\n<p>\u062a\u0633\u064a\u0631 \u0646\u0642\u0627\u0637 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 &#8220;\u0627\u0644\u0645\u062a\u063a\u064a\u0631\u0629&#8221; \u0639\u0644\u0649 \u0627\u0644\u0646\u062d\u0648 \u0627\u0644\u062a\u0627\u0644\u064a:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\u2192 \u2192 \u2192 \u0627\u0644\u0637\u0644\u0628\u0627\u062a<\/li>\n\n\n\n<li>\u2192 \u2192 \u2192 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0635\u0641\u0648\u0641 \u2190 \u062a\u0631\u062a\u064a\u0628 \u0627\u0644\u0635\u0641\u0648\u0641<\/li>\n\n\n\n<li>\u2192 \/ \u0648\u0638\u0627\u0626\u0641\/\u0648\u0638\u0627\u0626\u0641\/\u0648\u0638\u0627\u0626\u0641\/\u0648\u0638\u0627\u0626\u0641<\/li>\n<\/ul>\n\n<p>\u0645\u0646 \u0627\u0644\u0645\u0647\u0645 \u0645\u0639\u0631\u0641\u0629 \u0630\u0644\u0643\u060c \u0644\u0623\u0646\u0647 \u0639\u0646\u062f \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/timelogs -endpoint \u0644\u062a\u0633\u062c\u064a\u0644 \u0623\u062d\u062f\u0627\u062b \u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0648\u0645\u0627 \u0625\u0644\u0649 \u0630\u0644\u0643\u060c <strong>\u064a\u062c\u0628 \u0639\u0644\u064a\u0643 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u0643\u064a\u0627\u0646\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0635\u0644\u0629 \u0627\u0644\u0645\u0648\u062c\u0648\u062f\u0629 \u0641\u064a \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u062c\u062f\u0648\u0644\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c!<\/strong><\/p>\n\n<p>\u0639\u0644\u0649 \u0633\u0628\u064a\u0644 \u0627\u0644\u0645\u062b\u0627\u0644\u060c \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 <strong>\u0645\u0639\u0631\u0641_\u0648\u0638\u064a\u0641\u0629_\u062a\u062e\u0637\u064a\u0637_\u0627\u0644\u0625\u0646\u062a\u0627\u062c <\/strong>(\u0644\u0644\u062a\u0643\u0631\u0627\u0631: \u0648\u0638\u0627\u0626\u0641_\u062a\u062e\u0637\u064a\u0637_\u0627\u0644\u0625\u0646\u062a\u0627\u062c \u0647\u064a \u0627\u0644\u0643\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u062a\u064a \u064a\u062a\u0645 \u0627\u0644\u0648\u0635\u0648\u0644 \u0625\u0644\u064a\u0647\u0627 \u0645\u0646 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 \/ \u0627\u0644\u0648\u0638\u0627\u0626\u0641) \u0644\u0625\u0631\u0633\u0627\u0644 \u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u062c\u062f\u064a\u062f:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"867\" height=\"603\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png\" alt=\"\" class=\"wp-image-55407\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29.png 867w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-300x209.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-768x534.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-29-360x250.png 360w\" sizes=\"(max-width: 867px) 100vw, 867px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 5.<\/strong>  \u0637\u0644\u0628 POST \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a<\/figcaption><\/figure>\n\n<p>\u064a\u0645\u0643\u0646\u0643 \u0627\u0644\u0639\u062b\u0648\u0631 \u0639\u0644\u0649 production_planning_job_job_id \u0627\u0644\u0630\u064a \u062a\u062d\u062a\u0627\u062c\u0647 \u0645\u0646 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/phaser-jobs &#8211; \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/phaser-jobs:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"924\" height=\"870\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png\" alt=\"\" class=\"wp-image-55455\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30.png 924w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-300x282.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-30-360x339.png 360w\" sizes=\"(max-width: 924px) 100vw, 924px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 6.<\/strong> \u0637\u0644\u0628 \u0627\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0645\u0647\u0645\u0629 Phaser GET (\u0627\u0644\u0644\u0648\u0646 \u0627\u0644\u0623\u062d\u0645\u0631 \u0647\u0648 phaser_job_id\u060c <strong>\u0644\u0627 \u062a\u0633\u062a\u062e\u062f\u0645\u0647 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629<\/strong>)<\/figcaption><\/figure>\n\n<p>\u0623\u0648 \u0645\u0646 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 \/job -job -endpoint:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"926\" height=\"872\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png\" alt=\"\" class=\"wp-image-55490\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31.png 926w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-300x283.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-768x723.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-31-360x339.png 360w\" sizes=\"(max-width: 926px) 100vw, 926px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 7.<\/strong>  \u0637\u0644\u0628 \u0627\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \/ \u0648\u0638\u064a\u0641\u0629\/\u0648\u0638\u064a\u0641\u0629<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">\u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 REST-API<\/h4>\n\n<p>\u064a\u0633\u062a\u062e\u062f\u0645 \u0625\u0646\u0634\u0627\u0621 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0644\u0640 Skyplanner \u0645\u0646 \u062e\u0644\u0627\u0644 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0646\u0641\u0633 \u0627\u0644\u0642\u0648\u0627\u0639\u062f \u0648\u0627\u0644\u0623\u0646\u0638\u0645\u0629 \u0627\u0644\u0645\u0648\u062c\u0648\u062f\u0629 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645. \u0644\u0630\u0644\u0643 \u0642\u062f \u064a\u0643\u0648\u0646 \u0645\u0646 \u0627\u0644\u0645\u0641\u064a\u062f \u0623\u0646 \u062a\u062a\u0639\u0631\u0641 \u0639\u0644\u0649 \u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0646\u0638\u0627\u0645 \u0641\u064a \u0648\u0627\u062c\u0647\u0629 \u0627\u0644\u0645\u0633\u062a\u062e\u062f\u0645 \u0642\u0628\u0644 \u0645\u062d\u0627\u0648\u0644\u0629 \u0627\u0633\u062a\u062e\u062f\u0627\u0645\u0647 \u0645\u0646 \u062e\u0644\u0627\u0644 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a. <\/p>\n\n<h5 class=\"wp-block-heading\">\u0623\u0633\u0627\u0633\u064a\u0627\u062a \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a<\/h5>\n\n<p>\u064a\u062d\u062a\u0648\u064a Skyplanner \u0639\u0644\u0649 \u0623\u0631\u0628\u0639\u0629 \u0623\u0646\u0648\u0627\u0639 \u0645\u0646 \u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0627\u0644\u0632\u0645\u0646\u064a\u0629:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\u0628\u062f\u0627\u064a\u0629_\u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629<\/li>\n\n\n\n<li>\u0645\u062a\u0648\u0642\u0641 \u0645\u0624\u0642\u062a\u0627\u064b<\/li>\n\n\n\n<li>\u062a\u0627\u0628\u0639<\/li>\n\n\n\n<li>\u0646\u0647\u0627\u064a\u0629_\u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629<\/li>\n<\/ul>\n\n<p>\u064a\u062a\u0645 \u0625\u0631\u0633\u0627\u0644 \u062d\u062f\u062b Shift_begin-event \u0639\u0646\u062f \u0628\u062f\u0621 \u0627\u0644\u0645\u0647\u0645\u0629 \u0644\u0644\u0645\u0631\u0629 \u0627\u0644\u0623\u0648\u0644\u0649.  <strong>\u0644\u0627 \u062a\u0631\u0633\u0644 \u0623\u0628\u062f\u064b\u0627 \u0623\u0643\u062b\u0631 \u0645\u0646 \u062d\u062f\u062b_\u0628\u062f\u0621_\u0645\u0646\u0627\u0648\u0628\u0629_\u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0645\u0647\u0645\u0629!<\/strong><\/p>\n\n<p>\u064a\u0648\u0642\u0641 \u0627\u0644\u062d\u062f\u062b \u0627\u0644\u0645\u062a\u0648\u0642\u0641 \u0645\u0624\u0642\u062a\u064b\u0627 \u0627\u0644\u0645\u0647\u0645\u0629 \u0645\u0624\u0642\u062a\u064b\u0627.<\/p>\n\n<p>\u064a\u0633\u062a\u0623\u0646\u0641 \u0627\u0644\u062d\u062f\u062b \u0627\u0644\u0645\u0633\u062a\u0645\u0631 \u0648\u0638\u064a\u0641\u0629 \u0645\u062a\u0648\u0642\u0641\u0629 \u0645\u0624\u0642\u062a\u0627\u064b.<\/p>\n\n<p>\u064a\u0643\u0645\u0644 Shift_end \u0627\u0644\u0645\u0647\u0645\u0629.  <strong>\u0644\u0627 \u062a\u0631\u0633\u0644 \u0623\u0628\u062f\u064b\u0627 \u0623\u0643\u062b\u0631 \u0645\u0646 \u062d\u062f\u062b \u0646\u0647\u0627\u064a\u0629_\u0645\u0646\u0627\u0648\u0628\u0629_\u0648\u0627\u062d\u062f \u0644\u0643\u0644 \u0645\u0647\u0645\u0629!<\/strong><\/p>\n\n<p>\u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629 \u0644\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>\u0627\u0644\u0634\u062e\u0635_\u0627\u0644\u0645\u0639\u0631\u0641\n<ul class=\"wp-block-list\">\n<li>\u064a\u0645\u0643\u0646 \u0627\u0644\u0639\u062b\u0648\u0631 \u0639\u0644\u064a\u0647\u0627 \u0645\u0646 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 \/\u0627\u0644\u0646\u0627\u0633\/\u0627\u0644\u0623\u0634\u062e\u0627\u0635<\/li>\n\n\n\n<li>\u0644\u064a\u0633 \u0645\u062b\u0644 user_id!<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>\u0645\u0639\u0631\u0641_\u0645\u062d\u0637\u0629_\u0627\u0644\u0639\u0645\u0644_\u0627\u0644\u0645\u062e\u0637\u0637\u0629\n<ul class=\"wp-block-list\">\n<li>\u0645\u062d\u0637\u0629 \u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u062a\u064a \u064a\u062a\u0645 \u0627\u0644\u0639\u0645\u0644 \u0628\u0647\u0627<\/li>\n\n\n\n<li>\u064a\u0645\u0643\u0646 \u0627\u0644\u0639\u062b\u0648\u0631 \u0639\u0644\u064a\u0647\u0627 \u0645\u0646 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644\/\u0645\u062d\u0637\u0627\u062a \u0627\u0644\u0639\u0645\u0644<\/li>\n<\/ul>\n<\/li>\n\n\n\n<li>\u0627\u0644\u062a\u0627\u0631\u064a\u062e_\u0627\u0644\u0648\u0642\u062a\n<ul class=\"wp-block-list\">\n<li>\u0627\u0644\u0646\u0642\u0637\u0629 \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0627\u0644\u062a\u064a \u064a\u062a\u0645 \u0641\u064a\u0647\u0627 \u0627\u0644\u062d\u062f\u062b<\/li>\n\n\n\n<li>\u0627\u0644\u0635\u064a\u063a\u0629: 2024-01-01 10:30:11<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n<p>\u0645\u0646 \u0623\u062c\u0644 \u062a\u062d\u062f\u064a\u062f \u0645\u0627 \u0647\u0648 \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0644 Skyplanner \u0627\u0644\u0645\u0631\u062a\u0628\u0637 \u0628\u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0645\u0646 \u0623\u064a \u0646\u0638\u0627\u0645 \u062e\u0627\u0631\u062c\u064a \u062a\u0633\u062a\u062e\u062f\u0645\u0647\u060c \u064a\u0645\u0643\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0627\u0644\u062d\u0642\u0644 <strong>external_id <\/strong>. \u064a\u0645\u0643\u0646\u0643 \u0628\u0639\u062f \u0630\u0644\u0643 \u0639\u0644\u0649 \u0633\u0628\u064a\u0644 \u0627\u0644\u0645\u062b\u0627\u0644 \u0625\u062c\u0631\u0627\u0621 \u0637\u0644\u0628\u0627\u062a GET \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0647\u0630\u0627 \u0627\u0644\u0645\u0639\u0631\u0641 \u0644\u0644\u0639\u062b\u0648\u0631 \u0639\u0644\u0649 \u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u0645\u062d\u062f\u062f \u0645\u0646 Skyplanner. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"438\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png\" alt=\"\" class=\"wp-image-55587\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-1024x438.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-300x128.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-768x328.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32-360x154.png 360w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-32.png 1415w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 8.<\/strong>  \u0645\u0639\u0631\u0641 \u062e\u0627\u0631\u062c\u064a_\u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629<\/figcaption><\/figure>\n\n<h4 class=\"wp-block-heading\">\u0628\u062f\u0621 \u0627\u0644\u0639\u0645\u0644<\/h4>\n\n<p>\u064a\u0645\u0643\u0646\u0643 \u0628\u062f\u0621 \u0627\u0644\u0645\u0647\u0627\u0645 \u0639\u0646 \u0637\u0631\u064a\u0642 \u0625\u0631\u0633\u0627\u0644 \u0637\u0644\u0628 POST-\u0637\u0644\u0628 \u0645\u062b\u0644 \u0647\u0630\u0627 \u0625\u0644\u0649 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"624\" height=\"766\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png\" alt=\"\" class=\"wp-image-55638\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33.png 624w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-244x300.png 244w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-33-360x442.png 360w\" sizes=\"(max-width: 624px) 100vw, 624px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 9.<\/strong>  \u0633\u062c\u0644 \u0632\u0645\u0646_\u0628\u062f\u0627\u064a\u0629_\u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629<\/figcaption><\/figure>\n\n<p>\u0639\u0646\u062f \u062a\u0639\u064a\u064a\u0646 \u0628\u064a\u0627\u0646\u0627\u062a POST \u0644\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0642\u0645 \u0628\u062a\u0639\u064a\u064a\u0646 <strong>workift_id <\/strong>\u0643 0 \u0648 <strong>timelog_finalized <\/strong> <strong>\u0643\u0635\u062d\u064a\u062d<\/strong><\/p>\n\n<h4 class=\"wp-block-heading\">\u0625\u064a\u0642\u0627\u0641 \u0648\u0638\u064a\u0641\u0629 \u0645\u0624\u0642\u062a\u0627\u064b<\/h4>\n\n<p>\u0625\u064a\u0642\u0627\u0641 \u0627\u0644\u0645\u0647\u0627\u0645 \u0645\u0624\u0642\u062a\u064b\u0627 \u0639\u0646 \u0637\u0631\u064a\u0642 \u0625\u0631\u0633\u0627\u0644 \u0637\u0644\u0628 POST \u0645\u062b\u0644 \u0647\u0630\u0627:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"697\" height=\"760\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png\" alt=\"\" class=\"wp-image-55676\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34.png 697w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-34-360x393.png 360w\" sizes=\"(max-width: 697px) 100vw, 697px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 10.<\/strong>  \u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u0645\u062a\u0648\u0642\u0641 \u0645\u0624\u0642\u062a\u0627\u064b<\/figcaption><\/figure>\n\n<p>\u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0645\u0646 \u0627\u0644\u0646\u0648\u0639 \u0627\u0644\u0645\u062a\u0648\u0642\u0641 \u0645\u0624\u0642\u062a\u064b\u0627 \u064a\u0645\u0643\u0646\u0643 \u062a\u0639\u064a\u064a\u0646 <strong>\u0627\u0644\u0645\u0628\u0644\u063a <\/strong> <strong>\u0648\u0627\u0644\u0645\u0628\u0644\u063a_\u0627\u0644\u062e\u0627\u0637\u0626<\/strong>. \u0644\u0627\u062d\u0638 \u0623\u064a\u0636\u064b\u0627 <strong>\u0646\u0648\u0639 <\/strong>\u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a <strong>\u0648\u0627\u0644\u062a\u0627\u0631\u064a\u062e_\u0627\u0644\u0648\u0642\u062a<\/strong>. <\/p>\n\n<h4 class=\"wp-block-heading\">\u0627\u0644\u0627\u0633\u062a\u0645\u0631\u0627\u0631 \u0641\u064a \u0627\u0644\u0639\u0645\u0644<\/h4>\n\n<p>\u0625\u0644\u064a\u0643 \u0643\u064a\u0641\u064a\u0629 \u0645\u062a\u0627\u0628\u0639\u0629 \u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u0645\u062a\u0648\u0642\u0641 \u0645\u0624\u0642\u062a\u0627\u064b:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"713\" height=\"722\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png\" alt=\"\" class=\"wp-image-55715\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35.png 713w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-296x300.png 296w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-35-360x365.png 360w\" sizes=\"(max-width: 713px) 100vw, 713px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 11.<\/strong>  \u0627\u0633\u062a\u0645\u0631\u0627\u0631 \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a<\/figcaption><\/figure>\n\n<p>\u0644\u0627\u062d\u0638 \u0623\u0646\u0647 \u0625\u0630\u0627 \u062d\u0627\u0648\u0644\u062a \u0645\u062a\u0627\u0628\u0639\u0629 \u0645\u0647\u0645\u0629 \u062a\u0645 \u0625\u0646\u0647\u0627\u0624\u0647\u0627 \u0628\u0648\u0627\u0633\u0637\u0629 \u062d\u062f\u062b shift_end\u060c \u0641\u0633\u062a\u062d\u0635\u0644 \u0639\u0644\u0649 \u062e\u0637\u0623.<\/p>\n\n<h4 class=\"wp-block-heading\">\u0625\u0646\u0647\u0627\u0621 \u0648\u0638\u064a\u0641\u0629<\/h4>\n\n<p>\u0625\u0644\u064a\u0643 \u0643\u064a\u0641\u064a\u0629 \u0625\u0646\u0647\u0627\u0621 \u0645\u0647\u0645\u0629 \u0645\u0627 \u0628\u0648\u0627\u0633\u0637\u0629 \u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u0644\u0640 shift_end timelog:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"711\" height=\"764\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png\" alt=\"\" class=\"wp-image-55761\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36.png 711w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-279x300.png 279w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-36-360x387.png 360w\" sizes=\"(max-width: 711px) 100vw, 711px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 12.<\/strong>  \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0644\u0646\u0647\u0627\u064a\u0629_\u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629<\/figcaption><\/figure>\n\n<p>\u0641\u064a shift_end-events\u060c \u064a\u0645\u0643\u0646\u0643 \u0625\u0639\u0637\u0627\u0621 \u0642\u064a\u0645\u062a\u064a <strong>\u0627\u0644\u0645\u0628\u0644\u063a <\/strong> <strong>\u0648\u0627\u0644\u0645\u0628\u0644\u063a \u0627\u0644\u062e\u0627\u0637\u0626 <\/strong>\u062a\u0645\u0627\u0645\u064b\u0627 \u0643\u0645\u0627 \u0647\u0648 \u0627\u0644\u062d\u0627\u0644 \u0641\u064a \u0627\u0644\u0623\u062d\u062f\u0627\u062b \u0627\u0644\u0645\u062a\u0648\u0642\u0641\u0629 \u0645\u0624\u0642\u062a\u064b\u0627. \u0644\u0627\u062d\u0638 \u0623\u0646\u0647 \u0625\u0630\u0627 \u062d\u0627\u0648\u0644\u062a \u0627\u0644\u0642\u064a\u0627\u0645 \u0628\u0640 shift_end-events \u0644\u0645\u0647\u0645\u0629 \u0644\u064a\u0633\u062a \u0642\u064a\u062f \u0627\u0644\u062a\u0634\u063a\u064a\u0644\u060c \u0633\u062a\u062d\u0635\u0644 \u0639\u0644\u0649 \u062e\u0637\u0623. <\/p>\n\n<h4 class=\"wp-block-heading\">\u062a\u062d\u062f\u064a\u062b \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629<\/h4>\n\n<p>\u064a\u0645\u0643\u0646\u0643 \u062a\u062d\u062f\u064a\u062b \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0633\u062c\u0644 \u0627\u0644\u0632\u0645\u0646\u064a \u0639\u0646 \u0637\u0631\u064a\u0642 \u0625\u0631\u0633\u0627\u0644 \u0637\u0644\u0628\u0627\u062a PUT-REUT \u0625\u0644\u0649 \u0646\u0642\u0637\u0629 \u0646\u0647\u0627\u064a\u0629 \/timelogs-endpoint\u060c \u0645\u062b\u0644 \u0647\u0630\u0627:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"694\" height=\"757\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png\" alt=\"\" class=\"wp-image-55796\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37.png 694w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-275x300.png 275w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-37-360x393.png 360w\" sizes=\"(max-width: 694px) 100vw, 694px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 13.<\/strong>  \u062a\u062d\u0631\u064a\u0631 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629<\/figcaption><\/figure>\n\n<p>\u0644\u0627\u062d\u0638 \u0623\u0646\u0647 \u064a\u062c\u0628 \u0623\u0646 \u064a\u0643\u0648\u0646 \u0644\u062f\u064a\u0643 \u0643\u0644\u0627\u064b \u0645\u0646 \u0628\u064a\u0627\u0646\u0627\u062a <strong>\u0627\u0644\u0628\u062f\u0627\u064a\u0629Timelog <\/strong> <strong>\u0648\u0627\u0644\u0646\u0647\u0627\u064a\u0629Timelog <\/strong>\u0645\u0646 \u0623\u062c\u0644 \u0625\u062c\u0631\u0627\u0621 \u062a\u062d\u062f\u064a\u062b. \u064a\u062a\u0645 \u062a\u062e\u0632\u064a\u0646 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0641\u064a Skyplanner \u0639\u0644\u0649 \u0627\u0644\u0646\u062d\u0648 \u0627\u0644\u062a\u0627\u0644\u064a: \u0643\u0644 \u0633\u062c\u0644 \u0632\u0645\u0646\u064a &#8220;\u0643\u0627\u0645\u0644&#8221; (\u0633\u062c\u0644 \u0632\u0645\u0646\u064a \u064a\u062d\u062a\u0648\u064a \u0639\u0644\u0649 \u0628\u062f\u0627\u064a\u0629 \u0648\u0646\u0647\u0627\u064a\u0629 (\u0639\u0644\u0649 \u0633\u0628\u064a\u0644 \u0627\u0644\u0645\u062b\u0627\u0644: \u0628\u062f\u0627\u064a\u0629_\u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629\/\u0645\u0633\u062a\u0645\u0631 \u0648\u0625\u064a\u0642\u0627\u0641 \u0645\u0624\u0642\u062a\/\u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629) \u0644\u0647 \u0643\u064a\u0627\u0646 \u0645\u0646\u0641\u0635\u0644 \u0644\u0644\u0628\u062f\u0627\u064a\u0629 \u0648\u0627\u0644\u0646\u0647\u0627\u064a\u0629. <\/p>\n\n<p>\u064a\u062a\u0645 \u0625\u0642\u0631\u0627\u0646\u0647\u0627 \u0628\u0642\u064a\u0645\u0629 <strong>start_id <\/strong>\u0627\u0644\u0645\u0648\u062c\u0648\u062f\u0629 \u0641\u064a \u0633\u062c\u0644 \u0627\u0644\u0646\u0647\u0627\u064a\u0629. \u0641\u064a \u0627\u0644\u0645\u062b\u0627\u0644 \u0623\u0639\u0644\u0627\u0647\u060c \u064a\u0643\u0648\u0646 \u0644\u0640 startTimelog \u0642\u064a\u0645\u0629 \u0645\u0639\u0631\u0641 1\u060c \u0648\u0628\u0627\u0644\u062a\u0627\u0644\u064a \u0641\u0625\u0646 \u0642\u064a\u0645\u0629 endTimelog \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0647 \u0647\u064a \u0642\u064a\u0645\u0629 <strong>start_id <\/strong>1. <\/p>\n\n<p>\u064a\u062c\u0628 \u0639\u0644\u064a\u0643 \u0623\u064a\u0636\u064b\u0627 \u0625\u0639\u0637\u0627\u0621 \u0642\u064a\u0645\u062a\u064a <strong>person_id <\/strong>\u0648 <strong>endTimelog <\/strong>\u0644\u0643\u0644 \u0645\u0631\u0629 \u062a\u0642\u0648\u0645 \u0641\u064a\u0647\u0627 \u0628\u0637\u0644\u0628 \u062a\u062d\u062f\u064a\u062b \u062d\u062a\u0649 \u0644\u0648 \u0644\u0645 \u062a\u0643\u0646 \u062a\u0642\u0648\u0645 \u0628\u062a\u063a\u064a\u064a\u0631\u0647\u0645\u0627.<\/p>\n\n<h4 class=\"wp-block-heading\">\u0637\u0631\u0642 \u0628\u062f\u064a\u0644\u0629 \u0644\u0639\u0645\u0644 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629<\/h4>\n\n<p>\u0641\u064a\u0645\u0627 \u064a\u0644\u064a \u0628\u0639\u0636 \u0627\u0644\u0637\u0631\u0642 \u0627\u0644\u0628\u062f\u064a\u0644\u0629 \u0627\u0644\u062a\u064a \u064a\u0645\u0643\u0646\u0643 \u0645\u0646 \u062e\u0644\u0627\u0644\u0647\u0627 \u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u062f\u062e\u0648\u0644 \u0625\u0644\u0649 \u0648\u0638\u0627\u0626\u0641\u0643 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a.<\/p>\n\n<h5 class=\"wp-block-heading\">\u0644\u0648\u062c\u0641\u0648\u0644<\/h5>\n\n<p>\u0625\u0630\u0627 \u0643\u0646\u062a \u062a\u0631\u064a\u062f \u0625\u0631\u0633\u0627\u0644 \u0643\u0644 \u0645\u0646 \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 \u0644\u0644\u0628\u062f\u0627\u064a\u0629 \u0648\u0627\u0644\u0646\u0647\u0627\u064a\u0629 \u0641\u064a \u0637\u0644\u0628 \u0648\u0627\u062d\u062f\u060c \u064a\u0645\u0643\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 <strong>\/timelogs\/log-llog-ful-lendpoint\u060c<\/strong> \u0647\u0643\u0630\u0627:<\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"691\" height=\"721\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png\" alt=\"\" class=\"wp-image-55828\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38.png 691w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-38-360x376.png 360w\" sizes=\"(max-width: 691px) 100vw, 691px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 14.<\/strong>  \u0637\u0644\u0628 \u0644\u0648\u063a\u0641\u0648\u0644<\/figcaption><\/figure>\n\n<p>\u0644\u0627\u062d\u0638 \u0643\u064a\u0641\u064a\u0629 \u0625\u0631\u0633\u0627\u0644 \u0627\u0644\u0645\u0628\u0627\u0644\u063a \u0647\u0646\u0627: \u062a\u0634\u064a\u0631 \u0642\u064a\u0645\u0629 &#8220;\u0627\u0644\u0645\u0628\u0644\u063a&#8221; \u0627\u0644\u0623\u0648\u0644\u0649 \u0625\u0644\u0649 <strong>\u0627\u0644\u0645\u0628\u0644\u063a \u0627\u0644\u0645\u0639\u064a\u0628<\/strong> \u0648\u0627\u0644\u062b\u0627\u0646\u064a\u0629 \u0625\u0644\u0649 <strong>\u0627\u0644\u0645\u0628\u0644\u063a<\/strong>. \u064a\u0646\u0634\u0626 \u0647\u0630\u0627 \u0627\u0644\u0637\u0644\u0628 \u0643\u064a\u0627\u0646\u0627\u062a &#8220;\u0633\u062c\u0644 \u0627\u0644\u0628\u062f\u0627\u064a\u0629&#8221; \u0648&#8221;\u0633\u062c\u0644 \u0627\u0644\u0646\u0647\u0627\u064a\u0629&#8221; \u0641\u064a \u0637\u0644\u0628 \u0648\u0627\u062d\u062f. <\/p>\n\n<h5 class=\"wp-block-heading\">\u0627\u0644\u062a\u062f\u0648\u064a\u0646 \u0627\u0644\u0633\u0631\u064a\u0639<\/h5>\n\n<p>&#8220;\u0627\u0644\u062a\u062f\u0648\u064a\u0646 \u0627\u0644\u0633\u0631\u064a\u0639&#8221; \u0644\u0645\u0647\u0645\u0629 \u0645\u0627 \u064a\u0643\u0645\u0644\u0647\u0627 \u0641\u064a \u0637\u0644\u0628 \u0648\u0627\u062d\u062f\u060c \u0648\u064a\u0636\u0628\u0637 \u0643\u0645\u064a\u0629 \u0627\u0644\u0645\u0646\u062a\u062c\u0627\u062a \u0627\u0644\u0645\u0643\u062a\u0645\u0644\u0629 \u0644\u062a\u062a\u0646\u0627\u0633\u0628 \u0645\u0639 \u0627\u0644\u0642\u064a\u0645\u0629 \u0627\u0644\u0645\u062d\u062f\u062f\u0629 \u0641\u064a \u0639\u0646\u0635\u0631 \u0627\u0644\u0637\u0644\u0628. \u064a\u062a\u0645 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u062a\u062f\u0648\u064a\u0646 \u0627\u0644\u0633\u0631\u064a\u0639 \u0628\u0627\u0633\u062a\u062e\u062f\u0627\u0645 \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629 <strong>\/timelogs\/quick-log<\/strong> &#8211; \u0646\u0642\u0637\u0629 \u0627\u0644\u0646\u0647\u0627\u064a\u0629: <\/p>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"695\" height=\"723\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png\" alt=\"\" class=\"wp-image-55857\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39.png 695w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-288x300.png 288w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-39-360x375.png 360w\" sizes=\"(max-width: 695px) 100vw, 695px\" \/><figcaption class=\"wp-element-caption\"><strong>\u0627\u0644\u0634\u0643\u0644 15.<\/strong>  \u0627\u0644\u062a\u062f\u0648\u064a\u0646 \u0627\u0644\u0633\u0631\u064a\u0639<\/figcaption><\/figure>\n\n<p>\u0644\u0627\u062d\u0638 \u0623\u0646\u0643 \u0647\u0646\u0627 \u062a\u062d\u062a\u0627\u062c \u0641\u0642\u0637 \u0625\u0644\u0649 \u0625\u0639\u0637\u0627\u0621 <strong>\u0645\u0639\u0631\u0641_\u0645\u0647\u0645\u0629_\u062a\u062e\u0637\u064a\u0637_\u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c<\/strong> <strong>\u0648\u0645\u0639\u0631\u0641_\u0645\u062d\u0637\u0629_\u0627\u0644\u0639\u0645\u0644_\u0627\u0644\u0645\u062e\u0637\u0637 \u0644\u0647\u0627 <\/strong> <strong>\u0648\u0645\u0639\u0631\u0641_\u0627\u0644\u0645\u0648\u0638\u0641<\/strong>. \u064a\u062a\u0645 \u0645\u0644\u0621 \u0642\u064a\u0645 \u0627\u0644\u0648\u0642\u062a \u0648\u0627\u0644\u0645\u0628\u0644\u063a \u062a\u0644\u0642\u0627\u0626\u064a\u064b\u0627. \u0644\u0627\u062d\u0638 \u0623\u064a\u0636\u064b\u0627 \u0623\u0646 \u0627\u0644\u0645\u0647\u0627\u0645 \u0627\u0644\u062a\u064a \u062a\u0645 \u062a\u0633\u062c\u064a\u0644\u0647\u0627 \u0633\u0631\u064a\u0639\u064b\u0627 \u062a\u0643\u062a\u0645\u0644 \u062f\u0627\u0626\u0645\u064b\u0627 \u0628\u062d\u062f\u062b \u0646\u0647\u0627\u064a\u0629 \u0627\u0644\u0645\u0646\u0627\u0648\u0628\u0629\u060c \u0644\u0630\u0644\u0643 \u0644\u0627 \u064a\u0645\u0643\u0646 \u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0645\u0632\u064a\u062f \u0645\u0646 \u0627\u0644\u062a\u0633\u062c\u064a\u0644 \u0628\u0639\u062f \u0627\u0644\u062a\u0633\u062c\u064a\u0644 \u0627\u0644\u0633\u0631\u064a\u0639!  <\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u0628\u0646\u064a\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0645\u062e\u0637\u0637 \u0627\u0644\u0633\u0645\u0627\u0621 \u0642\u0628\u0644 \u0627\u0644\u063a\u0648\u0635 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u0642\u0644\u064a\u0644 \u0639\u0646 \u0628\u0646\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Skyplanner \u0648\u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u062a\u062d\u062a \u0627\u0644\u063a\u0637\u0627\u0621. \u0643\u0644 \u0647\u0630\u0627 \u0633\u064a\u0623\u062a\u064a \u0641\u064a \u0648\u0642\u062a \u0644\u0627\u062d\u0642. \u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062f\u0645\u062c \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628 \/ \u0623\u0645\u0631 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0644\u0648\u0638\u064a\u0641\u0629 \u0641\u064a Skyplanner\u060c \u0641\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u062d \u0623\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0645\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u0642\u0644 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0647\u0630\u0647: \u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644\u060c &#8230; <a title=\"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/\" aria-label=\"Read more about \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\">\u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f<\/a><\/p>\n","protected":false},"author":8,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[615],"doc_tag":[1513,616],"class_list":["post-61450","docs","type-docs","status-publish","hentry","doc_category-615","doc_tag-1513","doc_tag-616"],"acf":[],"year_month":"2026-11","word_count":89,"total_views":"177","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"Sami","author_nicename":"sami","author_url":"https:\/\/skyplanner.ai\/ar\/author\/sami\/"},"doc_category_info":[{"term_name":"\u0639\u0645\u0644\u064a\u0627\u062a \u0627\u0644\u062f\u0645\u062c","term_url":"https:\/\/skyplanner.ai\/ar\/docs-category\/%d8%b9%d9%85%d9%84%d9%8a%d8%a7%d8%aa-%d8%a7%d9%84%d8%af%d9%85%d8%ac\/"}],"doc_tag_info":[{"term_name":"\u0627\u0644\u062a\u0643\u0627\u0645\u0644","term_url":"https:\/\/skyplanner.ai\/ar\/docs-tag\/%d8%a7%d9%84%d8%aa%d9%83%d8%a7%d9%85%d9%84\/"},{"term_name":"\u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a","term_url":"https:\/\/skyplanner.ai\/ar\/docs-tag\/%d9%88%d8%a7%d8%ac%d9%87%d8%a9-%d8%a8%d8%b1%d9%85%d8%ac%d8%a9-%d8%a7%d9%84%d8%aa%d8%b7%d8%a8%d9%8a%d9%82%d8%a7%d8%aa\/"}],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/\" \/>\n<meta property=\"og:locale\" content=\"ar_AR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\" \/>\n<meta property=\"og:description\" content=\"\u0628\u0646\u064a\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0645\u062e\u0637\u0637 \u0627\u0644\u0633\u0645\u0627\u0621 \u0642\u0628\u0644 \u0627\u0644\u063a\u0648\u0635 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u0642\u0644\u064a\u0644 \u0639\u0646 \u0628\u0646\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Skyplanner \u0648\u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u062a\u062d\u062a \u0627\u0644\u063a\u0637\u0627\u0621. \u0643\u0644 \u0647\u0630\u0627 \u0633\u064a\u0623\u062a\u064a \u0641\u064a \u0648\u0642\u062a \u0644\u0627\u062d\u0642. \u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062f\u0645\u062c \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628 \/ \u0623\u0645\u0631 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0644\u0648\u0638\u064a\u0641\u0629 \u0641\u064a Skyplanner\u060c \u0641\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u062d \u0623\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0645\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u0642\u0644 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0647\u0630\u0647: \u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644\u060c ... \u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-07T11:17:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1142\" \/>\n\t<meta property=\"og:image:height\" content=\"796\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/\",\"name\":\"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"datePublished\":\"2025-03-06T12:14:16+00:00\",\"dateModified\":\"2025-10-07T11:17:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/#breadcrumb\"},\"inLanguage\":\"ar\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/image-25-1024x714.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ar\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ar\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ar\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/","og_locale":"ar_AR","og_type":"article","og_title":"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629","og_description":"\u0628\u0646\u064a\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0645\u062e\u0637\u0637 \u0627\u0644\u0633\u0645\u0627\u0621 \u0642\u0628\u0644 \u0627\u0644\u063a\u0648\u0635 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u0642\u0644\u064a\u0644 \u0639\u0646 \u0628\u0646\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Skyplanner \u0648\u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u062a\u062d\u062a \u0627\u0644\u063a\u0637\u0627\u0621. \u0643\u0644 \u0647\u0630\u0627 \u0633\u064a\u0623\u062a\u064a \u0641\u064a \u0648\u0642\u062a \u0644\u0627\u062d\u0642. \u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062f\u0645\u062c \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628 \/ \u0623\u0645\u0631 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0644\u0648\u0638\u064a\u0641\u0629 \u0641\u064a Skyplanner\u060c \u0641\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u062d \u0623\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0645\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u0642\u0644 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0647\u0630\u0647: \u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644\u060c ... \u0625\u0642\u0631\u0623 \u0627\u0644\u0645\u0632\u064a\u062f","og_url":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-07T11:17:35+00:00","og_image":[{"width":1142,"height":796,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25.png","type":"image\/png"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/","url":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/","name":"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ar\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","datePublished":"2025-03-06T12:14:16+00:00","dateModified":"2025-10-07T11:17:35+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/#breadcrumb"},"inLanguage":"ar","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/"]}]},{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2025\/03\/image-25-1024x714.png"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ar\/docs\/%d8%a7%d9%84%d8%b3%d8%ac%d9%84%d8%a7%d8%aa-%d8%a7%d9%84%d8%b2%d9%85%d9%86%d9%8a%d8%a9\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ar\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/ar\/docs\/"},{"@type":"ListItem","position":3,"name":"\u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ar\/#website","url":"https:\/\/skyplanner.ai\/ar\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ar\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ar\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ar"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ar\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ar\/","logo":{"@type":"ImageObject","inLanguage":"ar","@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ar\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Sami","author_link":"https:\/\/skyplanner.ai\/ar\/author\/sami\/"},"uagb_comment_info":0,"uagb_excerpt":"\u0628\u0646\u064a\u0629 \u0628\u064a\u0627\u0646\u0627\u062a \u0645\u062e\u0637\u0637 \u0627\u0644\u0633\u0645\u0627\u0621 \u0642\u0628\u0644 \u0627\u0644\u063a\u0648\u0635 \u0641\u064a \u0627\u0644\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0632\u0645\u0646\u064a\u0629\u060c \u0646\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u0645\u0646\u0627\u0642\u0634\u0629 \u0627\u0644\u0642\u0644\u064a\u0644 \u0639\u0646 \u0628\u0646\u064a\u0629 \u0627\u0644\u0628\u064a\u0627\u0646\u0627\u062a \u0641\u064a Skyplanner \u0648\u0643\u064a\u0641\u064a\u0629 \u0639\u0645\u0644 \u0627\u0644\u0623\u0634\u064a\u0627\u0621 \u062a\u062d\u062a \u0627\u0644\u063a\u0637\u0627\u0621. \u0643\u0644 \u0647\u0630\u0627 \u0633\u064a\u0623\u062a\u064a \u0641\u064a \u0648\u0642\u062a \u0644\u0627\u062d\u0642. \u0625\u0630\u0627 \u0642\u0645\u062a \u0628\u062f\u0645\u062c \u0628\u064a\u0627\u0646\u0627\u062a \u0627\u0644\u0637\u0644\u0628 \/ \u0623\u0645\u0631 \u0627\u0644\u0639\u0645\u0644 \/ \u0627\u0644\u0648\u0638\u064a\u0641\u0629 \u0641\u064a Skyplanner\u060c \u0641\u0645\u0646 \u0627\u0644\u0645\u0631\u062c\u062d \u0623\u0646\u0643 \u0627\u0633\u062a\u062e\u062f\u0645\u062a \u0639\u0644\u0649 \u0627\u0644\u0623\u0642\u0644 \u0646\u0642\u0627\u0637 \u0646\u0647\u0627\u064a\u0629 \u0648\u0627\u062c\u0647\u0629 \u0628\u0631\u0645\u062c\u0629 \u0627\u0644\u062a\u0637\u0628\u064a\u0642\u0627\u062a \u0647\u0630\u0647: \u0628\u0634\u0643\u0644 \u0641\u0639\u0627\u0644\u060c&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/docs\/61450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/comments?post=61450"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/docs\/61450\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/media?parent=61450"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/doc_category?post=61450"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ar\/wp-json\/wp\/v2\/doc_tag?post=61450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}